Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Overhauling Of Bottom Ash And Dfa System Of Unit 13 Of 2x200 Mw, Btps, Obra.
|
| Description |
Overhauling Of Bottom Ash And Dfa System Of Unit 13 Of 2x200 Mw, Btps, Obra.
|
| Organisation | UP Rajya Vidyut Utpadan Nigam Ltd | State Govt. and UT |
| Tender Id | 2025_RVUNL_1061157_1 |
|
Reference Number |
N-OBR////6000008917_00 |
| Tender Fee | 1180 |
| EMD | 20000 |
| Tender Value | - |
| Place | OTPS Obra |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1933668 |
| Start Date | July 30, 2025 19:30 |
| End Date |
Expired
22/08/2025
Expired 415 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply of clinker grinder bearings and h317 bearing sleeves for bottom ash handling system
Supply of clinker grinder bearings and h317 bearing sleeves for bottom ash handling system
Read moreSupply of clinker grinder bearings and h317 bearing sleeves for bottom ash handling system
Supply of clinker grinder bearings and h317 bearing sleeves for bottom ash handling system
Read moreSupply of clinker grinder body, wear plates and drive sprockets for bottom ash handling system
Supply of clinker grinder body, wear plates and drive sprockets for bottom ash handling system
Read moreCc divn proximate analysis of coal samples on monthly basis and ultimate analysis of coal on quaterly basis and ash fly ash and bottom ash samples on half yearly basis in ktps vii stage from the period from commencement of work to till date 31 03 2027
Cc divn proximate analysis of coal samples on monthly basis and ultimate analysis of coal on quaterly basis and ash fly ash and bottom ash samples on half yearly basis in ktps vii stage from the period from commencement of work to till date 31 03 2027
Read moreTggenco-btps-stage-ii-bm-division- complete overhauling of burner assemblies of unit-4 boiler during the overhaul in 2026-27
Tggenco-btps-stage-ii-bm-division- complete overhauling of burner assemblies of unit-4 boiler during the overhaul in 2026-27
Read moreSupply of seal plate for closing of openings/gaps on sides and bottom of 6a/b and 7 a/b conveyor gallery structure in chp area of btps, manuguru
Supply of seal plate for closing of openings/gaps on sides and bottom of 6a/b and 7 a/b conveyor gallery structure in chp area of btps, manuguru
Read moreTggenco btps stage ii bm-division- overhauling and servicing of various valves and safety valves in unit-4 boiler during the overhaul in fy 2026-27
Tggenco btps stage ii bm-division- overhauling and servicing of various valves and safety valves in unit-4 boiler during the overhaul in fy 2026-27
Read moreSupply of 40mm gi pipes for silo system laying of proposed air pipe line from stage-i vacuum pump house to silo utility building in ash handling systems of cam division/stage-i/btps
Supply of 40mm gi pipes for silo system laying of proposed air pipe line from stage-i vacuum pump house to silo utility building in ash handling systems of cam division/stage-i/btps
Read moreMaintenance of existing 10,000 nos plants at different locations around the pond -1 and pond -2 areas including providing tractor mounted water tanker for watering the plantation at btps ash pond from october 2026 to march 2027
Maintenance of existing 10,000 nos plants at different locations around the pond -1 and pond -2 areas including providing tractor mounted water tanker for watering the plantation at btps ash pond from october 2026 to march 2027
Read moreKtps-v- cam- strengthening of supporting columns of feed gate 10a and 10b and laying of painting over the bottom ash hopper peripheral area and its associated structural steel members of unit-10 in the year 2026-2027.-reg
Ktps-v- cam- strengthening of supporting columns of feed gate 10a and 10b and laying of painting over the bottom ash hopper peripheral area and its associated structural steel members of unit-10 in the year 2026-2027.-reg
Read moreof your Industry type