Tender Details
Particulars | Details |
---|---|
Title |
Krishnagiri Dt Shoolagiri Block Under Mines And Minerals 2021 2022 Construction Of Drain And Providing Paver Block From Main Road To Narayanareddy Hosue At B.S.Thimmasandhiram Village In B.S.Thimmasandhiram Panchayat Package No 02
|
Description |
Krishnagiri Dt Shoolagiri Block Under Mines And Minerals 2021 2022 Construction Of Drain And Providing Paver Block From Main Road To Narayanareddy Hosue At B.S.Thimmasandhiram Village In B.S.Thimmasandhiram Panchayat Package No 02
|
Organisation | Government of Tamil Nadu |
Tender Id | 2023_RDTN_391555_1 |
Reference Number |
RocNo_5697_2022_A4_02_06_2023 |
Tender Fee | 0 |
EMD | 2000 |
Tender Value | |
Place | The Panchayat President Office B.S.Thimmasandhiram |
Link | https://tntenders.gov.in |
Start Date | November 21, 2023 23:30 |
End Date |
23/11/2023 ( Expired 564 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Read moreConstruction of cc road and drain from kk shrivastav factory to trinching groun at ward no 10 and 12 tikamgarh
Construction of cc road and drain from kk shrivastav factory to trinching groun at ward no 10 and 12 tikamgarh
Read moreUnder crif (under the honorable cm announcement no.182/2021) widening/strengthening of nandprayag to ghat bazar(block) motor road km 01 to km 18.550 into intermediate lane in block- nandanagar, constituency assembly- tharali, district- chamoli.
Under crif (under the honorable cm announcement no.182/2021) widening/strengthening of nandprayag to ghat bazar(block) motor road km 01 to km 18.550 into intermediate lane in block- nandanagar, constituency assembly- tharali, district- chamoli.
Read moreAnnual surfacing on link road to village khatnol km. 0/00 to 10/000
Providing and laying 25 mm thick bituminous concrete along with providing and laying of hot applied thermoplastic compound 2.50 mm thick for edge line in between km. 8/00 to 9/00 ) add. kms. under amp 2025-26- village road
Read moreUnder the fourth phase of mukhyamantri urban infrastructure, construction of covered drain from bus stand to krishak sammelan bhawan in ward number 13 and 14.
Under the fourth phase of mukhyamantri urban infrastructure, construction of covered drain from bus stand to krishak sammelan bhawan in ward number 13 and 14.
Read moreAAAAAAAAAA
Login to viewConstruction of pucca drain from near aturia gp office to chayanika at aturia snasad no xii aturia gp under baduria block
Read moreZone no. 01, ward no. 04, at khaira purani basti (1) construction of rcc drain and toplayer cement concrete road form satish rawat ji house to rajkumar yadav ji house, (2) construction of rcc drain and wbm road from sanchi road to rajendra saket ji..
Zone no. 01, ward no. 04, at khaira purani basti (1) construction of rcc drain and toplayer cement concrete road form satish rawat ji house to rajkumar yadav ji house, (2) construction of rcc drain and wbm road from sanchi road to rajendra saket ji..
Read moreZone no. 04, ward no. 43, construction of rcc drain and road from shivanand tiwari ji house to sharda pandey ji and jitendra narayan pandey ji house.
Zone no. 04, ward no. 43, construction of rcc drain and road from shivanand tiwari ji house to sharda pandey ji and jitendra narayan pandey ji house.
Read moreConstruction of cc road from gandhi chowk to the drain and from gandhi chowk via patel house to kalam house to bajrang mandirat ward no. 04, sirali
Construction of cc road from gandhi chowk to the drain and from gandhi chowk via patel house to kalam house to bajrang mandirat ward no. 04, sirali
Read moreNew construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
Read moreof your Industry type