Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Bhaderwah Chamba Road Km 8th To Km 50th
|
| Description |
As Per Nit /Sbd
|
| Organisation | PWD | State Govt. and UT |
| Tender Id | 2026_PWDJK_300444_1 |
|
Reference Number |
E-NIT No. 06 of 2025-26 Dated 12.01.2026 |
| Tender Fee | 6000 |
| EMD | 5.99 Lakh |
| Tender Value | |
| Place | Bhaderwah |
| Link |
View Original Tender Notice
https://jktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=974632 |
| Start Date | January 13, 2026 15:30 |
| End Date |
Expired
02/02/2026
Expired 124 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of 1.mohjhari to chikhlamali road length 1.80 km 2. matkatola to wara road length 1.80 km
Construction of 1.mohjhari to chikhlamali road length 1.80 km&#x0d 2. matkatola to wara road length 1.80 km
Read moreConstruction of 1.sihari to dighori road length 3.00 km 2. kalimati thanegaon road length 3.00 km
Construction of 1.sihari to dighori road length 3.00 km&#x0d 2. kalimati thanegaon road length 3.00 km
Read moreWork on nh13 from km 957.56 to km 997.76 and from km 854.808 to km 871.928
Stmc work on nh13 from km 957.56 to km 997.76 and from km 854.808 to km 871.928
Read moreUpgradation improvement of dkhiah sutnga saipung pala upto semmasi road from 30.100 km to 58.10 km l 28.00 km under mlcip funded by the world bank
Upgradation improvement of dkhiah sutnga saipung pala upto semmasi road from 30.100 km to 58.10 km l 28.00 km under mlcip funded by the world bank
Read moreRepair maintenance of link road to village manjher km 0/00 to 0/400
Repair maintenance of link road to village manjher km 0/00 to 0/400
Read moreOne time improvement work of shahdol city portion to 2 lane with paved shoulders between existing km 132/500 (design km 0/00) to km 141/300 (design km 8.80) (length 8.80 km) on katni shahdol road section of nh-43 in the state of madhya pradesh.
One time improvement work of shahdol city portion to 2 lane with paved shoulders between existing km 132/500 (design km 0/00) to km 141/300 (design km 8.80) (length 8.80 km) on katni shahdol road section of nh-43 in the state of madhya pradesh.
Read moreFor strenthening work of garratola jhadgaon road total length 3.00 km proposed length 3.00 km for strenthening work of doke bithodi road total length 3.20 km
For strenthening work of garratola jhadgaon road total length 3.00 km proposed length 3.00 km&#x0d for strenthening work of doke bithodi road total length 3.20 km
Read moreProvision for shifting of the existing pipe line along the road from oerc sqr to lpr road via kanyasharm from 0/600 km to 1/027 km under watco section, niladri vihar
Provision for shifting of the existing pipe line along the road from oerc sqr to lpr road via kanyasharm from 0/600 km to 1/027 km under watco section, niladri vihar
Read moreConstruction and maintenance of road from l069-(link road) budhan to karamkatha km 4th pmgsy road to jamlan (waste plastics), package no. jk20-4286, pmgsy-iv (batch-i, 2026-27), block thuroo, district reasi, (length - 2.525 km)
Construction and maintenance of road from l069-(link road) budhan to karamkatha km 4th pmgsy road to jamlan (waste plastics), package no. jk20-4286, pmgsy-iv (batch-i, 2026-27), block thuroo, district reasi, (length - 2.525 km)
Read moreFor strenthening work of bhajiyadand rengajhari road total length 2.60 km proposed length 2.60 km
For strenthening work of bhajiyadand rengajhari road total length 2.60 km proposed length 2.60 km
Read moreof your Industry type