Fencing Of Transformers, Construction Of Plinth, Dt Trolley, Earthing Of Transformers, Changing Of Vcb And Control Panel And Protection Etc. To Ensure Power Supply In The Extended/Upgraded And Newly Created Bos Under Edd 2nd And 3rd
|
Description |
Fencing Of Transformers, Construction Of Plinth, Dt Trolley, Earthing Of Transformers, Changing Of Vcb And Control Panel And Protection Etc. To Ensure Power Supply In The Extended/Upgraded And Newly Created Bos Under Edd 2nd And 3rd
|
Organisation | Purvanchal Vidyut Vitran Nigam Limited Varanasi | State Govt. and UT |
Tender Id | 2024_PVVNV_942089_1 |
Reference Number |
40/EDC(M)/2024-25 |
Tender Fee | 3540 |
EMD | 22500 |
Tender Value | |
Place | EDD-Kopaganj and Ghosi |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1834399 |
Start Date | March 14, 2025 14:30 |
End Date |
21/03/2025 ( Expired 31 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Sitc of new control cum protection panel for hv side of 66 by 11kv 2mva transformers no. 01 and 02 along with dismantling of existing old panel at matatila hydro power plant distt lalitpur
Sitc of new control cum protection panel for hv side of 66 by 11kv 2mva transformers no. 01 and 02 along with dismantling of existing old panel at matatila hydro power plant distt lalitpur
Read moreSupply of tinned copper fuse wire of different size for distribution and power transformers and control cable for substation under edd moradabadrural, edd kanth and edd thakurdwara, moradabad
Supply of tinned copper fuse wire of different size for distribution and power transformers and control cable for substation under edd moradabadrural, edd kanth and edd thakurdwara, moradabad
Read moreElectrical testing division- mau, for the protection of power transformer due to faults in vcb, control panel etc. from time to time, repairing and repair work is done to protect the above mentioned vcb, control panel etc. from getting damaged.
Electrical testing division- mau, for the protection of power transformer due to faults in vcb, control panel etc. from time to time, repairing and repair work is done to protect the above mentioned vcb, control panel etc. from getting damaged.
Read moreTn-19063 supply, installation, testing and commissioning (etc) of control desk, vfd panel along with motors for travel, local control station (lcs), junction box, and 6.6 kv ht panel with vcb for stacker reclaimer no.1 at kstps, kota.
Supply, installation, testing and commissioning (etc) of control desk, vfd panel along with motors for travel, local control station (lcs), junction box, and 6.6 kv ht panel with vcb for stacker reclaimer no.1 at kstps, kota.
Read moreConstruction of 11 kv line / lt line etc. to ensure power supply in the extended / upgraded and newly created bos under edd-ghosi
Construction of 11 kv line / lt line etc. to ensure power supply in the extended / upgraded and newly created bos under edd-ghosi
Read moreFencing of transformers, construction of plinth, dt trolley, earthing of transformers, changing of vcb and control panel and protection etc. to ensure power supply in the extended/upgraded and newly created bos under edd-2nd and 3rd
Fencing of transformers, construction of plinth, dt trolley, earthing of transformers, changing of vcb and control panel and protection etc. to ensure power supply in the extended/upgraded and newly created bos under edd-2nd and 3rd
Read moreInstallation of additional transformers/increasing the capacity of transformers and protection of transformers etc. to ensure power supply in the extended/upgraded and newly created bos under electricity distribution division-ghosi.
Installation of additional transformers/increasing the capacity of transformers and protection of transformers etc. to ensure power supply in the extended/upgraded and newly created bos under electricity distribution division-ghosi.
Read moreInstallation of additional transformers/increasing the capacity of transformers and protection of transformers etc. to ensure power supply in the extended/upgraded and newly created bos under electricity distribution division-kopanganj
Installation of additional transformers/increasing the capacity of transformers and protection of transformers etc. to ensure power supply in the extended/upgraded and newly created bos under electricity distribution division-kopanganj
Read moreWork of increasing the capacity of power transformer etc. to ensure power supply in the extended/upgraded and newly created bos under electricity distribution section-kopaganj
Work of increasing the capacity of power transformer etc. to ensure power supply in the extended/upgraded and newly created bos under electricity distribution section-kopaganj
Read moreConstruction of 11 kv line/lt line etc. to ensure power supply in the extended/upgraded and newly created bos under chief minister nagar srijan yojana under electricity distribution section-kopaganj