Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of Pitline Drainage, Watering, Electrical Arrangements, Completion And Commissioning Of Pitline In All Aspects For Development Of Coaching Depot At Koteganguru In Mysuru Division, South Western Railway On Epc Mode
|
Description |
As Per Tender
|
Organisation | RITES Ltd. | Public Sector Undertakings |
Tender Id | 2023_RITES_177754_1 |
Reference Number |
|
Tender Fee | 8260 |
EMD | 9.46 Lakh |
Tender Value | |
Place | Bengaluru |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=194557 |
Start Date | December 15, 2023 16:30 |
End Date |
30/01/2024 ( Expired 525 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of vop near sadahalli gate at km.538.832 of ministry identified blackspot ka01 016bs for hyderabad bengaluru section of nh7 from km. 534.720 to km. 556.840 in the state of karnataka on epc mode
Construction of vop near sadahalli gate at km.538.832 of ministry identified blackspot ka01 016bs for hyderabad bengaluru section of nh7 from km. 534.720 to km. 556.840 in the state of karnataka on epc mode
Read moreCs for supervision of construction of major bridge with 4lane configuration on nh 14 over kangsabati and shilabati river in paschim medinipur of west bengal on epc mode
Cs for supervision of construction of major bridge with 4lane configuration on nh 14 over kangsabati and shilabati river in paschim medinipur of west bengal on epc mode
Read moreConsultancy services for ae for supervision of construction of missing link from birhu to lathiani into 4 lane from km 35.550 to km 42.800 on nh-503a including cable stayed bridge (0.860 km) in himachal pradesh on epc mode.
Consultancy services for ae for supervision of construction of missing link from birhu to lathiani into 4 lane from km 35.550 to km 42.800 on nh-503a including cable stayed bridge (0.860 km) in himachal pradesh on epc mode.
Read moreConsultancy services for authoritys engineer for supervision of construction of 4 lane with ps idar-badoli bypass section from design chainage km 81.300 to 95.500 of nh-168g in the state of gujarat ,total length 14.2 km, on epc mode
Consultancy services for authoritys engineer for supervision of construction of 4 lane with ps idar-badoli bypass section from design chainage km 81.300 to 95.500 of nh-168g in the state of gujarat ,total length 14.2 km, on epc mode
Read moreDevelopment of rail connectivity for mmlp indore in the state of madhya pradesh on epc mode
Development of rail connectivity for mmlp indore in the state of madhya pradesh on epc mode
Read moreConstruction of rob with approaches in lieu of railway crossing lc 20 on nh 161h at km 24.913 in the state of maharashtra on epc mode
Construction of rob with approaches in lieu of railway crossing lc 20 on nh 161h at km 24.913 in the state of maharashtra on epc mode
Read moreCs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Read moreConstruction of 33 kv line with mvcc along with metering installation for new mother and child hospital under deposit work scheme of ulubari electrical sub-division on full turnkey mode.
Construction of 33 kv line with mvcc along with metering installation for new mother and child hospital under deposit work scheme of ulubari electrical sub-division on full turnkey mode.
Read moreConstruction of commercial building and development works for bank of baroda at financial city, hardware park, bengaluru, karnataka on epc mode
Construction of commercial building and development works for bank of baroda at financial city, hardware park, bengaluru, karnataka on epc mode
Read moreDevelopment of 4 lane ac greenfield regional expressway on northern side of hyderabad from reddipalle vill (dc. 33.000) to islampur vill (dc. 59.000) for a design length of 26.000 km in telangana under nh(o) on epc mode (package ii)
Development of 4 lane ac greenfield regional expressway on northern side of hyderabad from reddipalle vill (dc. 33.000) to islampur vill (dc. 59.000) for a design length of 26.000 km in telangana under nh(o) on epc mode (package ii)
Read moreof your Industry type