Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Supply And Fixing Of 12 Watt Solar Light In Various Place In Vikasnagar Vidhan Sabha Area Dehradun
|
Description |
Supply And Fixing Of 12 Watt Solar Light In Various Places In Vikasnagar Vidhan Sabha Area Dehradun
|
Organisation | Vice Chairman Mussoorie Dehradun Development Authority Dehradun | State Govt. and UT |
Tender Id | 2024_MDDA_75456_1 |
Reference Number |
MDDA/ELEC/435/21/2024-25 |
Tender Fee | 2360 |
EMD | 75000 |
Tender Value | |
Place | DEHRADUN |
Link | https://uktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=90186 |
Start Date | September 07, 2024 19:30 |
End Date |
18/09/2024 ( Expired 271 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Read moreSupply installation implementation training and maintenance of tally software for hmt group of companies in india deployed on a cloud server
Supply installation implementation training and maintenance of tally software for hmt group of companies in india deployed on a cloud server
Read moreDesign, supply and installation of hrscc (high rate solid contact clarifier) in rcf wtp
Design, supply and installation of hrscc (high rate solid contact clarifier) in rcf wtp
Read moreRoad safety improvement of existing four lane section of dehradun-lal tappar-nepali farm section of nh7 (design chainage 501.930 to 531.330) and nepali farm motichur section of nh34 (dc 531.330 to 538.750) on epc mode in uttarakhand under nh(o)
Road safety improvement of existing four lane section of dehradun-lal tappar-nepali farm section of nh7 (design chainage 501.930 to 531.330) and nepali farm motichur section of nh34 (dc 531.330 to 538.750) on epc mode in uttarakhand under nh(o)
Read moreProvision of gas godown and connected infrastructure for vayu sena gas agency and provn of iron grill cover water tanks ph i in domestic area at afs tezpur
Provision of gas godown and connected infrastructure for vayu sena gas agency and provn of iron grill cover water tanks ph i in domestic area at afs tezpur 
 
Read moreDismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Read moreHandling and transportation of grains from fci depot to various fps in ajmer distt
Handling and transportation of grains from fci depot to various fps in ajmer distt
Read moreConstruction of various transmission elements (02 no. 400 kv and 02 no. 220 kv transmission lines) for proposed 400 kv gss amber (jaipur north) with installation of opgw network on existing line including survey, supply under bn-9018002511
Construction of various transmission elements (02 no. 400 kv and 02 no. 220 kv transmission lines) for proposed 400 kv gss amber (jaipuir north) with installation of opgw network on existing line including survey, supply under bn-9018002511(turnkey)
Read morePackage 20c design, engineering, supply,installation, testing, commissioning and comprehensive operation and maintenance of 3.0 mwp roof top solar pv project and associated support structure works on resco model for a period of 25 years.
Package 20c design, engineering, supply,installation, testing, commissioning and comprehensive operation and maintenance of 3.0 mwp roof top solar pv project and associated support structure works on resco model for a period of 25 years.
Read moreReplacement of ahu cooling coils installed at various underground metro stations of line 2, 3 and 6 in dmrc network.
Replacement of ahu cooling coils installed at various underground metro stations of line 2, 3 and 6 in dmrc network.
Read moreof your Industry type