Tender Details
Particulars | Details |
---|---|
Title |
S/R And Aluminum Partition Work Of Da Room With Staff Room At Second Floor In Judicial Block In Mini Sectt. Complex At Nuh In Nuh District
|
Description |
S/R And Aluminum Partition Work Of Da Room With Staff Room At Second Floor In Judicial Block In Mini Sectt. Complex At Nuh In Nuh District.
|
Organisation | Haryana Government | State Govt. and UT |
Tender Id | 2025_HRY_442334_1 |
Reference Number |
2025C0EF3FDE 3F01 4FBD 8A0C E988635E944E626BAR |
Tender Fee | 2180 |
EMD | 19000 |
Tender Value | |
Place | FEROZEPUR NAMAK |
Link | https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=519744 |
Start Date | April 23, 2025 23:30 |
End Date |
30/04/2025 ( Expired 13 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Desljtc of 220kv d/c u/g 1200 sq. mm xlpe cable for upcoming 220 kv tss of northern railway (at tughlakabad) from 220 kv s/s btps and setc of 02 no. 220 kv feeders for nr with associated civil work at 220 kv s/s btps new delhi on turnkey basis.
Desljtc of 220kv d/c u/g 1200 sq. mm xlpe cable for upcoming 220 kv tss of northern railway (at tughlakabad) from 220 kv s/s btps and setc of 02 no. 220 kv feeders for nr with associated civil work at 220 kv s/s btps new delhi on turnkey basis.
Read moreDrilling, installation and maintainance of 5 nos. of tube well (solar) at mouza-dudhe budhe and gobrageriya under keshiary block in the district of paschim medinipur under dpmu, paschim medinipur, wbadmi project ph-ii
Drilling, installation and maintainance of 5 nos. of tube well (solar) at mouza-dudhe budhe and gobrageriya under keshiary block in the district of paschim medinipur under dpmu, paschim medinipur, wbadmi project ph-ii
Read moreConstruction of 220 kv s/c dechu-tinwari line with 1x220 kv bay work at dechu and tinwari alongwith stringing of 2nd circuit on existing 132 kv s/c bhadala-khetusar line on d/c towers and 1x132 kv bay at 132 kv gss khetusar on trunkey basis
Construction of 220 kv s/c dechu-tinwari line with 1x220 kv bay work at dechu and tinwari alongwith stringing of 2nd circuit on existing 132 kv s/c bhadala-khetusar line on d/c towers and 1x132 kv bay at 132 kv gss khetusar on trunkey basis
Read moreUrgent repair of room no. 7,9,10,11,12,13,14 and partial main block roof treatment of dum dum girls high school (h.s) in the district of north 24 pgs.
Urgent repair of room no. 7,9,10,11,12,13,14 and partial main block roof treatment of dum dum girls high school (h.s) in the district of north 24 pgs.
Read moreProvision of solar street light in mtrdc residential area and technical area roof top solar panels 40kw on grid power plant at alisda technical complex jalahalli area and ceiling suspended type cassetee and split air conditioning work at cair etcun
Provision of solar street light in mtrdc residential area and technical area roof top solar panels 40kw on grid power plant at alisda technical complex jalahalli area and ceiling suspended type cassetee and split air conditioning work at cair etcun
Read moreSpecial repair to sewage line for type iii md accn at matri complex special repair to roof gutter of grc group bld no p 192 and provision of septic tank and soak well and allied services at main gate of technical area in r and de e pune
Special repair to sewage line for type iii md accn at matri complex special repair to roof gutter of grc group bld no p 192 and provision of septic tank and soak well and allied services at main gate of technical area in r and de e pune
Read moreYearly contract for removal of lead shots from firing butts and topping of existing sand with fresh sand and minor repair work in various butts of range complex, including pistol range under rfi control and 550m sniper tunnel of sqae.
Yearly contract for removal of lead shots from firing butts and topping of existing sand with fresh sand and minor repair work in various butts of range complex, including pistol range under rfi control and 550m sniper tunnel of sqae.
Read moreBalance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s
Balance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s
Read moreBalance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s
Balance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s
Read moreAnnual work of providing the services of room attendant including sweeping and cleaning , watch and ward , pump operation for water supply etc. of ghoradongri rest house in the year 2025-26 at stps, sarni .
Annual work of providing the services of room attendant including sweeping and cleaning , watch and ward , pump operation for water supply etc. of ghoradongri rest house in the year 2025-26 at stps, sarni .
Read moreof your Industry type