Tender Details

Particulars Details
Title
Making Of Cross Belt Jointing Cold Patching And Drum Lagging By Cold And Hot Joint In Rubber Nylon Belt Of 1200mm And 1400mm Width Belt Conveyors At Chp And Rls Of Bocp For Two Years
Description
Making Of Cross Belt Jointing, Cold Patching, And Drum Lagging By Cold And Hot Joint In Rubber/Nylon Belt Of 1200mm And 1400mm Width Belt Conveyors At Chp And Rls Of Bocp For Two Years
Organisation Mahanadi Coalfields Limited | Public Sector Undertakings
Tender Id 2025_MCL_343536_1
Reference
Number
MCL/GM_BA/EnM/eTender/252623 Dated 08/09/2025
Tender Fee 0
EMD 44800
Tender Value -
Place Bharatpur OCP
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=356103

Start Date September 09, 2025 15:30
End Date
Expired 19/09/2025

Expired 388 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Btps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027

Btps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027

Read more
Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.

Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.

Read more
Epc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).

Epc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).

Read more
Making of cross belt jointing, cold patching and drum lagging by cold and hot joint in rubber/nylon belt of 1200 mm and 1400 mm width belt conveyors at chp and rls of bocp for a period of 1 year.

Making of cross belt jointing, cold patching and drum lagging by cold and hot joint in rubber/nylon belt of 1200 mm and 1400 mm width belt conveyors at chp and rls of bocp for a period of 1 year.

Read more
Replacement of conveyor belt nylon 1200mm in c-6 n c-7 conveyors at rls, preparatory job for carrying out joints in c-6 n c-7 conveyors at rls, preparatory job for carrying out joints in case of belt snapping in c-6 n c-7 conveyors at rls, bocp

Replacement of conveyor belt nylon 1200mm in c-6 n c-7 conveyors at rls, preparatory job for carrying out joints in c-6 n c-7 conveyors at rls, preparatory job for carrying out joints in case of belt snapping in c-6 n c-7 conveyors at rls, bocp

Read more
Ichp- provision of rubber lagging over the pulleys in 1400mm and 1800mm belt width conveyors in stage-iii conveyors.

Ichp- provision of rubber lagging over the pulleys in 1400mm and 1800mm belt width conveyors in stage-iii conveyors.&amp#x0d &amp#x0d

Read more
Ichp-provision of rubber lagging over the pulleys in 1000mm, 1200mm, 1400mm width conveyors in sub dn.ii internal coal handling system.

Ichp-provision of rubber lagging over the pulleys in 1000mm, 1200mm, 1400mm width conveyors in sub dn.ii internal coal handling system.

Read more
Work of cold vulcanized belt jointing for belt conveyors of old chp at bhatadi ocm.

Work of cold vulcanized belt jointing for belt&#x0d conveyors of old chp at bhatadi ocm.

Read more
Hot jointing through splicing and hot vulcanization, hot patch of 1600 mm and 1400 mm steel cord belt, cold jointing of 1400 mm and 1000 mm pn belt, cold patch repair of all conveyors and pulley lagging of various drum pulleys in different conveyors

Hot jointing through splicing and hot vulcanization, hot patch of 1600 mm and 1400 mm steel cord belt, cold jointing of 1400 mm and 1000 mm pn belt, cold patch repair of all conveyors and pulley lagging of various drum pulleys in different conveyors

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise