Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repairing And Maintenance Of Coal Transportation Road From Nehariya Parasia Road To Coal Stock Yard Of Chhinda Mine Under Rawanwara Chhinda Sub Area Of Pench Area.
|
| Description |
Repairing And Maintenance Of Coal Transportation Road From Nehariya Parasia Road To Coal Stock Yard Of Chhinda Mine Under Rawanwara Chhinda Sub Area Of Pench Area.
|
| Organisation | Western Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_WCL_305362_2 |
|
Reference Number |
pe3350-civ-s-e057-2023-24 |
| Tender Fee | 0 |
| EMD | 43300 |
| Tender Value | - |
| Place | RAWANWARA |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=316401 |
| Start Date | March 16, 2024 19:30 |
| End Date |
Expired
27/03/2024
Expired 928 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Procurement of fog cannon (mist sprayer) with 40 mtrs jet length for installation at crushers to control the emission of dust at the source and mist cannon dust suppression systems (80 to 100 mtrs jet length) at coal stock yard to suppress the dust particles at pkoc, manuguru area including cmc for 3 years- reg
Procurement of fog cannon (mist sprayer) with 40 mtrs jet length for installation at crushers to control the emission of dust at the source and mist cannon dust suppression systems (80 to 100 mtrs jet length) at coal stock yard to suppress the dust particles at pkoc, manuguru area including cmc for 3 years- reg
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.
Read moreRepairing and maintenance of existing sub area office building at rawanwara-chhinda sub area of pench area.
Repairing and maintenance of existing sub area office building at rawanwara-chhinda sub area of pench area.
Read moreCutting of jungle/bushes and other vegetation as per the requirement of site at chhinda ocm under rawanwara chhinda sub area of pench area.
Cutting of jungle/bushes and other vegetation as per the requirement of site at chhinda ocm under rawanwara chhinda sub area of pench area.
Read moreProviding wind barrier around the coal stock yard at chhinda oc mine under rwa-cda sub area.
Providing wind barrier around the coal stock yard at chhinda oc mine under rwa-cda sub area.
Read moreRepairing of road to provide for an alternative way to access sethia mines under rawanwara-chhinda sub area under pench area.
Repairing of road to provide for an alternative way to access sethia mines under rawanwara-chhinda sub area under pench area.
Read moreRepairing of barbed wire fencing along coal stock yard of nehariya ug under nehariya sub area.
Repairing of barbed wire fencing along coal stock yard of nehariya ug under nehariya sub area.
Read moreof your Industry type