Tender Details
Particulars | Details |
---|---|
Title |
Auction Sale Of Seasonal Fruits Situated At Bhagirathi Cisf Camp To Bagbari Jhaljhalia, Both Sides Of Left Afflux Bundh
|
Description |
As Per The Auction Notice Attached
|
Organisation | Ministry of Water Resources | Central Govt. Ministry/Department |
Tender Id | 2024_MWR_740791_1 |
Reference Number |
EE/SID/DB/432 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | Near Bhagirathi CISF camp, Malda |
Link | https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1043809 |
Start Date | January 08, 2024 17:30 |
End Date |
11/01/2024 ( Expired 499 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreDevelopment of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreImprovement works to the dry stone revetment along the sides of the low pressure and high pressure penstock line between papanasam di weir and surge tank with allied works at papanasam lower camp
Improvement works to the dry stone revetment along the sides of the low pressure and high pressure penstock line between papanasam di weir and surge tank with allied works at papanasam lower camp
Read moreWidening of cc road both sides from ambedkar statue to kota reddy nagar at o v road
Widening of cc road both sides from ambedkar statue to kota reddy nagar at o v road in kandukur municipality
Read moreConstruction of brick wall around both sides of lift entrance on fobs at munirka, ullan batter marg, rtr marg, outer ring road moti lal nehru camp, dwarka approach road under pwd division south west road-i under sub division-i new delhi.
Construction of brick wall around both sides of lift entrance on fobs at munirka, ullan batter marg, rtr marg, outer ring road moti lal nehru camp, dwarka approach road under pwd division south west road-i under sub division-i new delhi.
Read moreAuction of silt/sand placed at left and right bank of sareli dyfrom km. 0.000 to 3.800 (lot-01)
Auction of silt/sand placed at left and right bank of sareli dyfrom km. 0.000 to 3.800 (lot-01)
Read moreConstruction of ipb street along with drain both sides from h/o alok to kapil in ward 20 mc hodal as demand by smt. rashmi at sr. no.7 during jansambad
Construction of ipb street along with drain both sides from h/o alok to kapil in ward 20 mc hodal as demand by smt. rashmi at sr. no.7 during jansambad
Read moreConstruction of ipb street along with drain both sides from h/o antra to kishan mali and fateh singh to dalu in ward 19 mc hodal
Construction of ipb street along with drain both sides from h/o antra to kishan mali and fateh singh to dalu in ward 19 mc hodal as demand by smt. seema at sr. no. 19 during jansambad
Read moreFabrication and erection of shed with rolling shutter assembly at the barrel situated at left bank of gomati river from amar shahid path to gomati aquaduct at km 1.300
Fabrication and erection of shed with rolling shutter assembly at the barrel situated at left bank of gomati river from amar shahid path to gomati aquaduct at km 1.300
Read moreof your Industry type