Tender Details

Particulars Details
Title
Sinking Of 1 No Tube Well 300 Mm X 200 Mm Tube Well Of 180 Mtrs Depth By Direct Rotary Rig Method Using Pvc Pipe And Fiber Glass Reinforced Epoxy Resin Sloted Filter At Tw 3(a) Site At Silampur Pump House No Ii
Description
Sinking Of 1 No Tube Well 300 Mm X 200 Mm Tube Well Of 180 Mtrs Depth By Direct Rotary Rig Method Using Pvc Pipe And Fiber Glass Reinforced Epoxy Resin Sloted Filter At Tw 3(a) Site At Silampur Pump House No Ii
Organisation Government of West Bengal
Tender Id 2023_PHED_527521_2
Reference
Number
03/2023-2024/EE/DWSD/PHE Dte
Tender Fee
EMD 29019
Tender Value
Place Office of the EE_DWSD_PHE Dte_Durgapur-12
Link https://wbtenders.gov.in
Start Date June 13, 2023 00:00
End Date

27/06/2023 ( Expired 741 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Sinking of 200 mm. dia deep tube well with top enlargement 300 mm. dia, depth of tube well is considered around 102 mtr with pvc pipe by direct rotary rig boring system within englishbazar municipality area, malda at ward no-05.(sl no -02)

Sinking of 200 mm. dia deep tube well with top enlargement 300 mm. dia, depth of tube well is considered around 102 mtr with pvc pipe by direct rotary rig boring system within englishbazar municipality area, malda at ward no-05.(sl no -02)

Read more
Civil and electrical work for sinking of two nos deep tube well 300 x 200 of depth 180 m at municipal trenching ground ward no 10 and northen corner of ramnagar math play ground ward no 18 including 500 m hdpe pipe laying and 2 years o and m in sm

Civil and electrical work for sinking of two nos deep tube well 300 x 200 of depth 180 m at municipal trenching ground ward no 10 and northen corner of ramnagar math play ground ward no 18 including 500 m hdpe pipe laying and 2 years o and m in sm

Read more
Sinking of 23 nos tube well of for each tube well approximate length for housing pipe 300 mm dia length 50 m, well pipe 200 mm dia 60 m, strainer 200 mm dia length 24 m, blank pipe 200 mm dia length 6 m. by direct rotary rig method using upvc pipes

Sinking of 23 nos tube well of for each tube well approximate length for housing pipe 300 mm dia length 50 m, well pipe 200 mm dia 60 m, strainer 200 mm dia length 24 m, blank pipe 200 mm dia length 6 m. by direct rotary rig method using upvc pipes

Read more
Wbphed/ae/hq/enit_02/25-26_7

Sinking of 300 mm x 200 mm dia tube well 150 mtr. depth by d.r. rig method using upvc pipe cm and upvc deep well screen rms for 5th tw site at keotara village of abujhati pwss

Read more
Sinking of 200 mm. dia deep tube well with top enlargement 300 mm. dia, depth of tube well is considered around 102 mtr with pvc pipe by direct rotary rig boring system within englishbazar municipality area, malda at ward no-18 on required location.

Sinking of 200 mm. dia deep tube well with top enlargement 300 mm. dia, depth of tube well is considered around 102 mtr with pvc pipe by direct rotary rig boring system within englishbazar municipality area, malda at ward no-18 on required location.

Read more
Sinking of 23 nos tube well of for each tube well approximate length for housing pipe 300 mm dia length 50 m, well pipe 200 mm dia 60 m, strainer 200 mm dia length 24 m, blank pipe 200 mm dia length 6 m. by direct rotary rig method using upvc pipes

Sinking of 23 nos tube well of for each tube well approximate length for housing pipe 300 mm dia length 50 m, well pipe 200 mm dia 60 m, strainer 200 mm dia length 24 m, blank pipe 200 mm dia length 6 m. by direct rotary rig method using upvc pipes

Read more
Construction of 250 mm dia. production tube wells by any suitable method (reverse/direct/dual rotary) using mud-rotary drilling rig for 01 water supply scheme (01 no. tube well) of district samba of samba province under jal jeevan mission

Construction of 250 mm dia. production tube wells by any suitable method (reverse/direct/dual rotary) using mud-rotary drilling rig for 01 water supply scheme (01 no. tube well) of district samba of samba province under jal jeevan mission

Read more
Construction of 250 mm dia. production tube wells by any suitable method (reverse/direct/dual rotary) using mud-rotary drilling rig for 01 water supply scheme (01 no. tube well) of district samba of samba province under jal jeevan mission

Construction of 250 mm dia. production tube wells by any suitable method (reverse/direct/dual rotary) using mud-rotary drilling rig for 01 water supply scheme (01 no. tube well) of district samba of samba province under jal jeevan mission

Read more
Sinking of 20 nos tube well of size 300x200 mm dia. and 146 mtr. deep by direct rotary rig method using upvc pipes. boundary wall 40 mtr each with one number gate for each tube well at zone -1,2 and 3 size -(10 x 10) sqm each. pump room as per de

Sinking of 20 nos tube well of size 300x200 mm dia. and 146 mtr. deep by direct rotary rig method using upvc pipes. boundary wall 40 mtr each with one number gate for each tube well at zone -1,2 and 3 size -(10 x 10) sqm each. pump room as per de

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise