Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Selection Of Solar Power Developer For Setting Up Of 110 Mw (Ac) Grid Connected Solar Pv Power Project In Uttar Pradesh Under Captive Mode.
|
| Description |
Selection Of Solar Power Developer For Setting Up Of 110 Mw (Ac) Grid Connected Solar Pv Power Project In Uttar Pradesh Under Captive Mode.
|
| Organisation | National Capital Region Transport Corporation | Public Sector Undertakings |
| Tender Id | 2025_NCRTC_244445_1 |
|
Reference Number |
DM/EL/COR-OF/282 |
| Tender Fee | 0 |
| EMD | 4.4 Crore |
| Tender Value | - |
| Place | NCRTC GatiShakti Bhawan, INA, New Delhi |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=279698 |
| Start Date | October 07, 2025 20:30 |
| End Date |
Expired
14/10/2025
Expired 369 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Rfs for selection of solar power developer for setting up 100 mw grid connected floating solar power project
Rfs for selection of solar power developer for setting up 100 mw grid connected floating solar pv power project at tansa and/or modak sagar dam on design-finance-build-own-operate-transfer through tariff based competative bidding process.
Read moreSelection of developer for design, engineering, supply, financing, procurement, installation, testing, commissioning, operation and maintenance of a grid connected 3 mw ac solar pv power plant integrated with a 1 mw 4 mwh battery energy storage sys
Selection of developer for design, engineering, supply, financing, procurement, installation, testing, commissioning, operation and maintenance of a grid connected 3 mw ac solar pv power plant integrated with a 1 mw 4 mwh battery energy storage sys
Read moreSelection of solar power developers for setting up of 150 mw solar pv power projects with 75 mw/300 mwh energy storage systems (ess) in the state of bihar under tariff-based competitive bidding
Selection of solar power developers for setting up of 150 mw solar pv power projects with 75 mw/300 mwh energy storage systems (ess) in the state of bihar under tariff-based competitive bidding
Read moreInstallation of 150 kwp grid-connected rooftop solar pv systems and 70 kwp carport-type solar pv systems along with 3 nos. of 10 kwp grid-connected solar pv trees (total 30 kwp) at sri sri madhabdev kalakhetra, narayanpur, assam
Installation of 150 kwp grid-connected rooftop solar pv systems and 70 kwp carport-type solar pv systems along with 3 nos. of 10 kwp grid-connected solar pv trees (total 30 kwp) at sri sri madhabdev kalakhetra, narayanpur, assam
Read morePackage ts-bess-01 for setting up of 187.5 mw / 750 mwh (187.5 mw x 4 hrs) battery energy storage system(bess) in telangana
Package ts-bess-01 for setting up of 187.5 mw / 750 mwh (187.5 mw x 4 hrs) battery energy storage system(bess) in telangana
Read moreSelection of solar power developer for design, engineering, supply, installation, testing, commissioning, operation and maintenance of 2 mw ac solar pv power plant on resco model for 25 year period under two cover system
Selection of solar power developer for design, engineering, supply, installation, testing, commissioning, operation and maintenance of 2 mw ac solar pv power plant on resco model for 25 year period under two cover system
Read moreRfp for tariff discovery and developer selection for 2mw flexible pv solar projects in goa under resco model
Rfp for tariff discovery and developer selection for 2mw flexible pv solar projects in goa under resco model
Read moreRequest for qualification cum rfp for development of 200 mw (plus minus 10 percent) solar plant with 50 or 100mwh battery energy storage system under captive mode for ulbs of mp
Request for qualification cum rfp for development of 200 mw (plus minus 10 percent) solar plant with 50 or 100mwh battery energy storage system under captive mode for ulbs of mp
Read moreImplementation of tentative of 50 mwp cumulative grid connected roof top solar pv systems under resco mode at various locations in the state of punjab with payment security mechanism
Implementation of tentative of 50 mwp cumulative grid connected roof top solar pv systems under resco mode at various locations in the state of punjab with payment security mechanism
Read moreEoi for empanelment of vendors- solar pv system with battery energy storage system - site survey, design, engineering, supply, installation, testing and commissioning and 10 years of o and m of grid-connected rooftop solar pv system.
Eoi for empanelment of vendors and rate contract under two-bid system for site survey, design, engineering, supply, installation, testing, commissioning and comprehensive operation an maintenance for 10 years
Read moreof your Industry type