Tender Details

Particulars Details
Title
General Dr Protection Chakkampuzha Thodu Near Sh Hospital Ramapuram Side Protection Works To Left Bank Of Chakkampuzha Thodu Near Sh Hospital In Ward No 11 Of Ramapuram Panchayath General Civil Work
Description
This Work Is Proposed For Side Protection&Amp#X0d Works To Left Bank Of Chakkampuzha Thodu Near&Amp#X0d Sh Hospital In Ward No 11 Of Ramapuram&Amp#X0d Panchayath .
Organisation Irrigation Department | State Govt. and UT
Tender Id 2025_Irrig_819253_1
Reference
Number
2/5992/AEE/MI/SUBDN/PALA/25-26
Tender Fee 1940
EMD 21985
Tender Value -
Place Ramapuram
Link
View Original Tender Notice

https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1373217

Start Date November 05, 2025 20:30
End Date
Expired 11/11/2025

Expired 299 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
General chakkampuzha thodu side protection- reach 2-general-protecting the right bank of chakkambuzha thodu in ward no 2 of karoor panchayath -upstream portion of checkdam and protection works to left bank of chakkampuzha thodu in ward no

Proposed estimate is to protect the sides of chakkampuzha thodu using dr masonry for a&amp#x0d length of 34 m at 1.80 height in the left side of thodu. a dr is also proposed of 38 m length 1.80 height in the right bank &amp#x0d

Read more
General-protection work-marangad thodu-protecting the right and left banks of marangad thodu in ward no.5 and ward no.6 of ramapuram panchayth-general civil work

Proposed estimate is to protect the right side of thodu for a length of 25 m and height 3m&amp#x0d and protecting the existing kadav for a length 1m on both sides using same dr cross section&amp#x0d

Read more
General-desiltation of thodu in ramapuram panchayath-clearing and desilting of palavely puthuvely thodu in ward no-14 of ramapuram panchayath-general civil work

An average depth of excavation of 50 cm is provided for a length of 3.455 km &amp#x0d and clearing jungle of 3 km is provided&amp#x0d

Read more
General-navakeralam 2023-protection work-meenachil thodu-protecting the left bank of meenachil thodu near kumbani bridge in ward no.8 of mutholy panchayath-general civil work-nava keralam

The estimate is to protect the sides of kumbanithodu for a length of 45 m with heights&amp#x0d 2.50 m and 20m of 2m ht.desilting also proposed in thodu because&amp#x0d of the large silt deposit in the thodu. junda provisions are also provided &amp#x0d

Read more
General chempanthotty side protection side protection in d/s left bank in chempanthotty thodu near chempanthotty bridge in sreekandapuram muncipality irikkur la kannur district general civil work 1

General chempanthotty side protection side protection in d/s left bank in chempanthotty thodu near chempanthotty bridge in sreekandapuram muncipality irikkur la kannur district general civil work 1

Read more
General-pinarayi-puthukkayil thodu-renovation of sluice and dr protection works near mouth of puthukkayil thodu in ward 3 of pinarayi panchayath, dharmadam constituency, kannur district. -general civil work-1

General-pinarayi-puthukkayil thodu-renovation of sluice and dr protection works near mouth of puthukkayil thodu in ward 3 of pinarayi panchayath, dharmadam constituency, kannur district. -general civil work-1

Read more
General urgent protection on the left and right banks of kollam thodu csind urgent protection on the left and right banks of kollam thodu in between ch 72.75 km to 73.10 km general civil work

General urgent protection on the left and right banks of kollam thodu csind urgent protection on the left and right banks of kollam thodu in between ch 72.75 km to 73.10 km general civil work

Read more
General-desilting - lalam thodu- ward no 7- ramapuram-desiltaion works to lalam thodu (from chempakasherry check dam to chittett palam) in ward no. 7 of ramapuram panchayath-general civil work

Desilting is planned for a total length of 950m , in which 200m is coming under curve portion and 750 m coming under striaght portion.in curve portion depth of excavation is 80cm and 50cm is the depth of excation for straight portion.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise