Tender Details
Particulars | Details |
---|---|
Title |
Complete Repairing And Overhauling Of 04 Nos. Bearing Housing Assly. Usl Vibrating Screen Unit No. 218 B1 B2 And 04 Nos. Er Mass Dead Weight With Shaft Of Vibrating Screen Unit No, 221 A1 A2 Of Main Plant Of Kedla Washery
|
Description |
Complete Repairing And Overhauling Of 04 Nos. Bearing Housing Assly. Usl Vibrating Screen Unit No. 218 B1 B2 And 04 Nos. Er Mass Dead Weight With Shaft Of Vibrating Screen Unit No, 221 A1 A2 Of Main Plant Of Kedla Washery
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_CCL_329060_1 |
Reference Number |
PO/KW/E-TENDER/24-25/122, Date-14/02/2025 |
Tender Fee | 0 |
EMD | 4100 |
Tender Value | |
Place | KEDLA WASHERY |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=341063 |
Start Date | February 15, 2025 15:30 |
End Date |
26/02/2025 ( Expired 53 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Replacement of unit auxiliary supply boards of machine no. 1 2 and 3 with 08 nos. 04 pole edo microprocessor based 0.4kv, 630a acbs and 18 nos. 32a, 06 nos. 63 a and 06 nos. 150a mccb switch disconnectors at matatila hydro power plant distt. lalitpur
Replacement of unit auxiliary supply boards of machine no. 1 2 and 3 with 08 nos. 04 pole edo microprocessor based 0.4kv, 630a acbs and 18 nos. 32a, 06 nos. 63 a and 06 nos. 150a mccb switch disconnectors at matatila hydro power plant distt. lalitpur
Read moreWork of complete overhauling, servicing and checking of 40 nos. electrolyser cell stream-a along with supply of required spares of stream a of hydrogen plant at sgtps, mppgcl, birsinghpur.
Work of complete overhauling, servicing and checking of 40 nos. electrolyser cell stream-a along with supply of required spares of stream a of hydrogen plant at sgtps, mppgcl, birsinghpur.
Read moreRepairing/rebuilding of worn out housing of arm(02 no.), boom (02 nos. ) boom cylinder foot pin ( 02 nos.), arm cylinder eye (04 nos.), boom foot housing (02 no.) and bucket cylinder eye (02 nos.) and then co-axial line boring to its original size i
Repairing/rebuilding of worn out housing of arm(02 no.), boom (02 nos. ) boom cylinder foot pin ( 02 nos.), arm cylinder eye (04 nos.), boom foot housing (02 no.) and bucket cylinder eye (02 nos.) and then co-axial line boring to its original size i
Read moreRepairing, maintenance and complete overhauling with spares of one no 2000 gpm 150 mtr head 2 stage flowmore make centrifugal pump sl no-17042951 at peocp,hazaribagh area.
Repairing, maintenance and complete overhauling with spares of one no 2000 gpm 150 mtr head 2 stage flowmore make centrifugal pump sl no-17042951 at peocp,hazaribagh area.
Read moreComplete repairing, rectification and full overhauling works with spares of one no. kirloskar make, 100 mtr head, 2000 gpm, single stage, spilt case, 250mm x 200mm size, up-200/56 type pump assembly, sl.no.-1748918012 in respect of pump jocp, hazarib
Complete repairing, rectification and full overhauling works with spares of one no. kirloskar make, 100 mtr head, 2000 gpm, single stage, spilt case, 250mm x 200mm size, up-200/56 type pump assembly, sl.no.-1748918012 in respect of pump jocp, hazarib
Read moreComplete repairing and overhauling of one no. mnp make, 1000 gpm, 4 chr, multistage pump and onsite commissioning the pump on the base plate and alignment with the prime mover, in mine, w.r.t. karo opencast project, bnk area
Complete repairing and overhauling of one no. mnp make, 1000 gpm, 4 chr, multistage pump and onsite commissioning the pump on the base plate and alignment with the prime mover, in mine, w.r.t. karo opencast project, bnk area
Read moreReplacement, repairing of damaged intermediate frame and deck plates, installation of idler frame with rollers fabrication and erection of same at unit no. 1401 belt conveyor at loading section at madhuban coal washery under block-ii area, bccl .
Replacement, repairing of damaged intermediate frame and deck plates, installation of idler frame with rollers fabrication and erection of same at unit no. 1401 belt conveyor at loading section at madhuban coal washery under block-ii area, bccl .
Read moreDismantling and repairing of er weight pulley 04 nos. at loading section at madhuban coal washery under block-ii area, bccl .
Dismantling and repairing of er weight pulley 04 nos. at loading section at madhuban coal washery under block-ii area, bccl .
Read moreComplete repairing rewinding of stator of 75kw, 3 phase, 415v motor, 1480 rpm, make crompton greaves, sl. no. arl 531 installed at main sump and repairing rewinding of 02 nos. of stator of 22kw, 415v, 38a, 1465 rpm induction motor
Complete repairing rewinding of stator of 75kw, 3 phase, 415v motor, 1480 rpm, make crompton greaves, sl. no. arl 531 installed at main sump and repairing rewinding of 02 nos. of stator of 22kw, 415v, 38a, 1465 rpm induction motor
Read moreComplete repairing/rewinding of 05 nos. 900 kw, 6.6 kv, 1492 rpm marathon make ht induction motors of gevra project with sl no. sn- 3f660874/17, 3f660955/6, 3f660682/2, 3f660874/20 and 3f660874/8.
Complete repairing/rewinding of 05 nos. 900 kw, 6.6 kv, 1492 rpm marathon make ht induction motors of gevra project with sl no. sn- 3f660874/17, 3f660955/6, 3f660682/2, 3f660874/20 and 3f660874/8.
Read moreof your Industry type