| Particulars | Details |
|---|---|
| Title |
For Maintenance Of 400 A, 11 Kv, Ocb With Installation
|
| Description |
For Maintenance Of 400 A, 11 Kv, Ocb With Installation
Of Oto And Eti Protection With The Circuitof1000 Kva Transformer Installed At Kdsii
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_BCCL_286638_1 |
|
Reference Number |
BCCL/AVI/EnM/2023-24/85 |
| Tender Fee | - |
| EMD | 1225 |
| Tender Value | - |
| Place | Kusunda Area |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | August 22, 2023 16:30 |
| End Date |
Expired
28/08/2023
Expired 1142 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply of 1300 sets, 11kv 400a ab switches with composite polymeric post insulators
Supply of 1300 sets, 11kv 400a ab switches with composite polymeric post insulators
Read moreFor repairing of incomer 400a,6.6kv, ocb switch sl.no. bsp/switch/06 make ferguson at ekra substation basdeopur colliery under sijua area
For repairing of incomer 400a,6.6kv, ocb switch sl.no. bsp/switch/06 make ferguson at ekra substation basdeopur colliery under sijua area
Read moreMaintenance and reconditioning of 2 nos. vcb (11kv and 6.6kv, pce make), 2 nos. ocb switch (11kv, 800 amp, gec make), sf6 abb make breaker (33kv, 1250 amp), maintenance of ct, and repairing of 11kv capacitor bank control panel at central substation
Maintenance and reconditioning of 2 nos. vcb (11kv and 6.6kv, pce make), 2 nos. ocb switch (11kv, 800 amp, gec make), sf6 abb make breaker (33kv, 1250 amp), maintenance of ct, and repairing of 11kv capacitor bank control panel at central substation
Read moreThorough repairing, overhauling and replacement of defective spare parts of 1 no. incomer and 2 nos. outgoing h.t. ocb (6.6 kv) with 1 no h.t. vcb at topsia drainage pumping station.
Read moreFlameproof transwitch unit (flp tsu) 315kva, 3.3kv/550v (or 525v),flameproof switch board panel comprising of seven flameproof 3.3kv, 400a vcb,flameproof switch board panel comprising of four flameproof 3.3kv, 400a vcb,flameproof vacuum circuit breaker 3.3kv, 400a,flameproof air circuit breaker 400a, 550v,flameproof air circuit breaker 200a, 550v,flameproof air circuit breaker 100a, 550v
Flameproof transwitch unit (flp tsu) 315kva, 3.3kv/550v (or 525v),flameproof switch board panel comprising of seven flameproof 3.3kv, 400a vcb,flameproof switch board panel comprising of four flameproof 3.3kv, 400a vcb,flameproof vacuum circuit breaker 3.3kv, 400a,flameproof air circuit breaker 400a, 550v,flameproof air circuit breaker 200a, 550v,flameproof air circuit breaker 100a, 550v
Read more11kv switchboards for water works substation 9vcb,installation, testing , commissioning of 11kv switchboards for water works substation 09 vcb,11kv switchboards for sector4 substation,installation, testing , commissioning of 11kv switchboards for sector4 substation,11kv switchboards for sector7 substation,nstallation, testing , commissioning of 11kv switchboards for sector7 substation.,11kv switchboards for adbuilding substation,installation, testing , commissioning of 11kv switchboards for adbuilding substation,11kv switchboards for workshop area substation,installation, testing , commissioning of 11kv switchboards for workshop area substation,11kv switchboards for lab area substation,installation, testing , commissioning of 11kv switchboards for lab area substation
11kv switchboards for water works substation 9vcb,installation, testing , commissioning of 11kv switchboards for water works substation 09 vcb,11kv switchboards for sector4 substation,installation, testing , commissioning of 11kv switchboards for sector4 substation,11kv switchboards for sector7 substation,nstallation, testing , commissioning of 11kv switchboards for sector7 substation.,11kv switchboards for adbuilding substation,installation, testing , commissioning of 11kv switchboards for adbuilding substation,11kv switchboards for workshop area substation,installation, testing , commissioning of 11kv switchboards for workshop area substation,11kv switchboards for lab area substation,installation, testing , commissioning of 11kv switchboards for lab area substation
Read moreElectrical line shifting 11kv
Estimate for shifting of 11 kv line and lt line composite line and dtr hight extension purpose due to road winding from bus stand shahpur to barbatpur road of under cmo nagar parishad shahpur
Read moreStabilization of 11kv line
Stabilization of 11kv tap line and lt distribution network feeding divisional office and stores at ushp ii kangan
Read moreof your Industry type