Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repairs And Maintenance Works At Kala Talav T E Building Compound Kalyan 421301 For Six Months During The Year 2024 25
|
| Description |
Repairs And Maintenance Works At Kala Talav T E Building Compound Kalyan 421301 For Six Months During The Year 2024 25
|
| Organisation | Bharat Sanchar Nigam Limited (Govt of India Enterprise) | Public Sector Undertakings |
| Tender Id | 2025_BSNL_225773_1 |
|
Reference Number |
NIT NO 53/EEC/BSNL/KYN/2024-25 |
| Tender Fee | 590 |
| EMD | 9040 |
| Tender Value | - |
| Place | KALYAN WEST |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=252743 |
| Start Date | February 05, 2025 16:30 |
| End Date |
Expired
12/02/2025
Expired 606 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repairs/ re-construction of collapsed compound wall at rknt incline in srirampur area.,mancherial (dist),t.g.
Repairs/ re-construction of collapsed compound wall at rknt incline in srirampur area.,mancherial (dist),t.g.
Read moreMaintenance of owaisi colony park at rein bazar-82, circle-26, yakutpura circle, charminar zone, ubd, ghmc during the year 2026-27 (450 sqmtr) for 8 months
Maintenance of owaisi colony park at rein bazar-82, circle-26, yakutpura circle, charminar zone, ubd, ghmc during the year 2026-27 (450 sqmtr) for 8 months
Read moreProviding window mesh, roof repairs, painting, electrification (fans and tube lights) and compound wall required at tgtwurjc (b) kataram (v) of kataram (m) in jayashankar bhupalapally district
Providing window mesh, roof repairs, painting, electrification (fans and tube lights) and compound wall required at tgtwurjc (b) kataram (v) of kataram (m) in jayashankar bhupalapally district
Read moreMaintenance of owaisi colony park (basthi dawakana)at rein bazar-82, circle-26, yakutpura circle, charminar zone, urban biodiversity, ghmc during the year 2026-27 (450 sqmtr) for 8 months
Maintenance of owaisi colony park (basthi dawakana)at rein bazar-82, circle-26, yakutpura circle, charminar zone, urban biodiversity, ghmc during the year 2026-27 (450 sqmtr) for 8 months
Read moreTransportation of coal from srp groups of mines (srp-1 and srp-3 and 3a inclines) to srpchp on weight basis under unit rate basis for a period of six (6) months as per the scope of work, terms and conditions of nit.
Transportation of coal from srp groups of mines (srp-1 and srp-3 and 3a inclines) to srpchp on weight basis under unit rate basis for a period of six (6) months as per the scope of work, terms and conditions of nit.
Read moreKtps vii stage- adm-ss-periodical testing ,painting ,repairs and reconditioning of 40nos argon gas cylinders in outdoor dtores-ii/ss division during the fy 2026-27
Ktps vii stage- adm-ss-periodical testing ,painting ,repairs and reconditioning of 40nos argon gas cylinders in outdoor dtores-ii/ss division during the fy 2026-27
Read moreEstimate for maintenance of central median at east anandbagh central median from nmdc clony to east anandbagh rub in malkajgiri circle 05 malkajgiri zone mmc for the 12 months during the year 2026 27
Estimate for maintenance of central median at east anandbagh central median from nmdc clony to east anandbagh rub in malkajgiri circle 05 malkajgiri zone mmc for the 12 months during the year 2026 27
Read moreEstimate for maintenance of central median at vayupuri central media phase 2 from sri laxmi furniture world to neredmet x road in moulali circle 04 malkajgiri zone mmc for the 12 months during the year 2026 27
Estimate for maintenance of central median at vayupuri central media phase 2 from sri laxmi furniture world to neredmet x road in moulali circle 04 malkajgiri zone mmc for the 12 months during the year 2026 27
Read moreRaising of compound wall epdm flooring open gym area, rain water harvesting pits and repairs to toilets at kavuri hills park 1 and kavuri hills park 2 of ward no 232, madhapur circle-50, kp zone, cmc
Raising of compound wall epdm flooring open gym area, rain water harvesting pits and repairs to toilets at kavuri hills park 1 and kavuri hills park 2 of ward no 232, madhapur circle-50, kp zone, cmc
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreof your Industry type