Tender Details
Particulars | Details |
---|---|
Title |
For Supply Of 11 Mtr. Long Steel Tubular Pole With Welded Base Plate, 410 Sp 55 Bottom Portion Hot Dip Galvanized
|
Description |
For Supply Of 11 Mtr. Long Steel Tubular Pole With Welded Base Plate, 410 Sp 55 Bottom Portion Hot Dip Galvanized
|
Organisation | Paschimanchal Vidyut Vitran Nigam Ltd. | State Govt. and UT |
Tender Id | 2024_PVVNL_974875_1 |
Reference Number |
PVVNL-MT/MM/132/24-25 |
Tender Fee | 11800 |
EMD | 20.17 Lakh |
Tender Value | |
Place | Urja Bhavan Victoria park PVVNL Meerut |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1709780 |
Start Date | November 19, 2024 21:30 |
End Date |
07/12/2024 ( Expired 188 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply of 8 m long 540 sp-11 swaged type galvanized steel tubular poles including base plate, u clamp, bolts, nuts, steppers e r p coating to various sub regional stores under kseb
Supply of 8 m long 540 sp-11 swaged type galvanized steel tubular poles including base plate, u clamp, bolts, nuts, steppers e r p coating to various sub regional stores under kseb
Read moreSupply of 100 nos. of 9.5 metres l.t. galvanized steel tubular pole
Supply of 100 nos. of 9.5 metres l.t. galvanized steel tubular pole
Read moreSupply, erection, commissioning of new low head type pan capacity 60 ton (heating surface 277.5 mtr. sq.) complete calendria with s.s. tubes fitting and hydraulic testing with bottom saucer and all accessories for season 2025-26
Supply, erection, commissioning of new low head type pan capacity 60 ton (heating surface 277.5 mtr. sq.) complete calendria with s.s. tubes fitting and hydraulic testing with bottom saucer and all accessories for season 2025-26
Read moreConstruction of rcc foundation for steel structure galvanized tubular steel structure staging 4.5 mtr. for hdpe water storage tank and solar panel 2000 liters capacity water storage tank etc at chaplasi village, bhandaria block under garhwa district
Construction of rcc foundation for steel structure galvanized tubular steel structure staging 4.5 mtr. for hdpe water storage tank and solar panel 2000 liters capacity water storage tank etc at chaplasi village, bhandaria block under garhwa district
Read moreConstruction of 90 mtr deep drilled tube well rcc foundation for steel structure and solar panel galvanized tubular steel structure 5000 liters water storage tank laying of rising and distribution pipe etc work at chaplasi village, bhandaria block
Construction of 90 mtr deep drilled tube well rcc foundation for steel structure and solar panel galvanized tubular steel structure 5000 liters water storage tank laying of rising and distribution pipe etc work at chaplasi village, bhandaria block
Read moreSupply erection and commissioning of d.m water pump horizontal split casing along with motor and base plate m.s for clarified water pump house i capacity 94.5 m3 at hr
Supply erection and commissioning of d.m water pump horizontal split casing along with motor and base plate m.s for clarified water pump house i capacity 94.5 m3 at hr
Read moreSupply and installation of 02 nos 6x140-150 watt led semi high mast light with 9.5 mtr pole for d.r.d.bijnor u.p.
Supply and installation of 02 &#x0d nos 6x140-150 watt led semi high mast light with 9.5 mtr pole &#x0d for d.r.d.bijnor u.p.
Read moreSupplying and installation of led light with pole (steel tubular pole) and supply, laying of cable and other allied accessories,at sripur musnabir mahabir mandir ward no-11 under borough-1, asansol municipal corporation.
Supplying and installation of led light with pole (steel tubular pole) and supply, laying of cable and other allied accessories,at sripur musnabir mahabir mandir ward no-11 under borough-1, asansol municipal corporation.
Read moreSupply of 8.5meter long steel tubular pole sp-23 ( bottom portion hot dip galvanized) 24,000nos
Supply of 8.5meter long steel tubular pole sp-23 ( bottom portion hot dip galvanized) 24,000nos
Read moreSupply of 9meter long steel tubular pole sp-33 ( bottom portion hot dip galvanized) 12,000nos
Supply of 9meter long steel tubular pole sp-33 ( bottom portion hot dip galvanized) 12,000nos&#x0d &#x0d
Read moreof your Industry type