Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repair Of 04 No. Dewatering Pumps And Other Allied Works Of Dewatering System Installed At Chep Iii
|
| Description |
As Per Sbd
|
| Organisation | JKSPDC | State Govt. and UT |
| Tender Id | 2024_FD_250818_1 |
|
Reference Number |
21 of 2024-25 |
| Tender Fee | 500 |
| EMD | 4000 |
| Tender Value | - |
| Place | Dibber |
| Link |
View Original Tender Notice
https://jktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=846179 |
| Start Date | March 12, 2025 23:30 |
| End Date |
Expired
19/03/2025
Expired 572 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply and installation of new standby 20hp dewatering pumps in foundation gallery(+250ft) at nagarjuna sagar dam, nalgonda district, telangana
Supply and installation of new standby 20hp dewatering pumps in foundation gallery(+250ft) at nagarjuna sagar dam, nalgonda district, telangana
Read moreSupply of slurry duty dewatering pumps for utilization at various locations of ash water recovery system and zero discharge system
Supply of slurry duty dewatering pumps for utilization at various locations of ash water recovery system and zero discharge system
Read moreTggenco-ytps-supply of bearings for gravimetric feeder main drive gearbox, coc gearbox, pulleys, rollers and lube oil pumps of hp1103 bowl mills for unit-iii boiler division.
Tggenco-ytps-supply of bearings for gravimetric feeder main drive gearbox, coc gearbox, pulleys, rollers and lube oil pumps of hp1103 bowl mills for unit-iii boiler division.
Read moreConstruction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for daniawan-gaya road (sh-04) 6-lane (3-lane on each side) at one location in the state of bihar
Construction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for daniawan-gaya road (sh-04) 6-lane (3-lane on each side) at one location in the state of bihar
Read moreHiring of dewatering pumps for two months for safeguarding of installed
Hiring of dewatering pumps for two months for safeguarding of installedequipment at pvunl.
Read moreof your Industry type