Tender Details
Particulars | Details |
---|---|
Title |
Replacement Of Old Damaged Ac Sheets With 0.6mm Thick Galvalume Sheet In Roofing Of Godown No.1 At Swh Badoli, District Palwal.
|
Description |
Replacement Of Old Damaged Ac Sheets With 0.6mm Thick Galvalume Sheet In Roofing Of Godown No.1 At Swh Badoli, District Palwal.
|
Organisation | Haryana Board Corporation | State Govt. and UT |
Tender Id | 2025_HBC_440132_1 |
Reference Number |
20254219625E 5177 419C A9E6 CB3CF548D9391135HWC |
Tender Fee | 1770 |
EMD | 17500 |
Tender Value | |
Place | BAROLI |
Link | https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=517498 |
Start Date | April 12, 2025 19:30 |
End Date |
19/04/2025 ( Expired 2 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of proposed r.o.b. and its approaches in replacement of existing level crossing no.21x at km ch.107/500 of nh 64 district anand in the state of gujarat
Construction of proposed r.o.b. and its approaches in replacement of existing level crossing no.21x at km ch.107/500 of nh 64 district anand in the state of gujarat
Read moreWbpwd/pw(r)/se/shc/nit no 03 of 2025-2026(4th-call)
Sukanta setu(r.o.b) with approaches - replacement of damaged surface course and other allied works of repair and maintenance in footpath ,railing etc under alipore highway sub division under south 24 parganas highway division in the district of sout
Read moreAll in one bid for construction of 1 nos water detention structure at godkhali uttar wds, mouza-godkhali , block- basanti ,gp-masjidbati, jl no 144 , plot no 1368 in the district of south 24 parganas under wbadmip -phase ii
All in one bid for construction of 1 nos water detention structure at godkhali uttar wds, mouza-godkhali , block- basanti ,gp-masjidbati, jl no 144 , plot no 1368 in the district of south 24 parganas under wbadmip -phase ii
Read moreAll in one bid for construction of 1 nos water detention structure at dakshin amraberia wds, mouza- dakshin amraberia , block- kulpi ,gp- chandipur , jl no 89 , plot no 2501 in the district of south 24 parganas under wbadmip -phase ii
All in one bid for construction of 1 nos water detention structure at dakshin amraberia wds, mouza- dakshin amraberia , block- kulpi ,gp- chandipur , jl no 89 , plot no 2501 in the district of south 24 parganas under wbadmip -phase ii
Read moreAll in one bid for construction of 1 nos water detention structure at mrinalnagar wds, mouza-mrinalnagar , block-kakdwip ,gp-rabindra, jl no 28 , plot no 525 in the district of south 24 parganas under wbadmip -phase ii
All in one bid for construction of 1 nos water detention structure at mrinalnagar wds, mouza-mrinalnagar , block-kakdwip ,gp-rabindra, jl no 28 , plot no 525 in the district of south 24 parganas under wbadmip -phase ii
Read moreAll in one bid for construction of 1 nos water detention structure at sitarampur srinagar wds, mouza-sitarampur srinagar , block- kakdwip ,gp-suryanagar, jl no 07,08 , plot no 11,40,78 in the district of south 24 parganas under wbadmip
All in one bid for construction of 1 nos water detention structure at sitarampur srinagar wds, mouza-sitarampur srinagar , block- kakdwip ,gp-suryanagar, jl no 07,08 , plot no 11,40,78 in the district of south 24 parganas under wbadmip -p-i
Read moreAll in one bid for construction of 1 nos water detention structure at uttar durgapur dakshin wds, mouza-uttar durgapur , block- kakdwip ,gp-rabindra, jl no 26 , plot no 488 in the district of south 24 parganas under wbadmip -phase ii
All in one bid for construction of 1 nos water detention structure at uttar durgapur dakshin wds, mouza-uttar durgapur , block- kakdwip ,gp-rabindra, jl no 26 , plot no 488 in the district of south 24 parganas under wbadmip -phase ii
Read moreReplacement of unit auxiliary supply boards of machine no. 1 2 and 3 with 08 nos. 04 pole edo microprocessor based 0.4kv, 630a acbs and 18 nos. 32a, 06 nos. 63 a and 06 nos. 150a mccb switch disconnectors at matatila hydro power plant distt. lalitpur
Replacement of unit auxiliary supply boards of machine no. 1 2 and 3 with 08 nos. 04 pole edo microprocessor based 0.4kv, 630a acbs and 18 nos. 32a, 06 nos. 63 a and 06 nos. 150a mccb switch disconnectors at matatila hydro power plant distt. lalitpur
Read moreConstruction work of c.c. road m-30, m-20 and curbed drain at various places in uday nagar basti no.1 basti 2 basti 3 and new shobhapur and old gokalpur area under gokalpur ward. (any mad)
Construction work of c.c. road m-30, m-20 and curbed drain at various places in uday nagar basti no.1 basti 2 basti 3 and new shobhapur and old gokalpur area under gokalpur ward. (any mad)
Read moreHiring of 1 no. new ac jeep (bs-6) (11 plus 1) or equ. seating capacity make (e.g. force motor toofan or equivalent) with latest model i.e. year 2024 onward and registration in taxi quota
Hiring of 1 no. new ac jeep (bs-6) (11 plus 1) or equ. seating capacity make (e.g. force motor toofan or equivalent) with latest model i.e. year 2024 onward and registration in taxi quota
Read moreof your Industry type