Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Rotor Repair Work Of Mill Turbine No 1 Sl No 290019 Model No 290 Mm
|
| Description |
Rotor Repair Work Of Mill Turbine No 1 Sl No 290019 Model No 290 Mm
|
| Organisation | GM (The Kisan Sahkari Chini Mills Ltd. Nadehi) | State Govt. and UT |
| Tender Id | 2025_KCMN4_85494_1 |
|
Reference Number |
PS/33A/2025-26 |
| Tender Fee | 354 |
| EMD | 20000 |
| Tender Value | - |
| Place | Nadehi |
| Link |
View Original Tender Notice
https://uktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=101542 |
| Start Date | July 19, 2025 20:30 |
| End Date |
Expired
04/08/2025
Expired 437 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ma17st00t343109200-turbine rotor centring tool along with hex head stud
Ma17st00t343109200-turbine rotor centring tool along with hex head stud
Read moreAssembly of gas turbine rotor with the supply of consumables make
Assembly of gas turbine rotor with the supply of consumables makesiemens model v94.2 at ntpc dadri
Read moreReconditioning refurbishment of rotor blade row1 of 13 d2 gas turbine of
Reconditioning refurbishment of rotor blade row1 of 13 d2 gas turbine ofntpc anta
Read moreRefurbishment and hsb of rgc turbine rotor of dhdt unit of mathura refinery
Refurbishment and hsb of rgc turbine rotor of dhdt unit of mathura refinery
Read moreProcurement of hip turbine rotor with complete blade assembly with extension shaft for main turbine of unit5and6, 2x660 mw units of csctpp, chhabra
Procurement of hip turbine rotor with complete blade assembly with extension shaft for main turbine of unit5and6, 2x660 mw units of csctpp, chhabra
Read moreMain steam turbine control fluid system spares for accumulator bladder assembly model: s-35-b-m50-c,main steam turbine control fluid system spares for accumulator bladder assembly model: s-55-b-m50-c-,main steam turbine control fluid system spares for accumulator bladder assembly model: s-55-b-m50-c-,drive turbine governing oil system spares for accumulator bladder assembly model: s-35-b-m50-c-v cap
Main steam turbine control fluid system spares for accumulator bladder assembly model: s-35-b-m50-c,main steam turbine control fluid system spares for accumulator bladder assembly model: s-55-b-m50-c-,main steam turbine control fluid system spares for accumulator bladder assembly model: s-55-b-m50-c-,drive turbine governing oil system spares for accumulator bladder assembly model: s-35-b-m50-c-v cap
Read moreTurbine flow meter,turbine flow meter,turbine flow meter
Turbine flow meter,turbine flow meter,turbine flow meter
Read moreSupply of double part endless wire rope sling as per specification attached,supply of sling with both end reeving, 6 x 37 fibre core construction as per specification attached,hp turbine turn buckle of min. 10 tonnes swl with both ends fork for turbine hp rotor as per specf,lp turbine turn buckle of min. 40 tonnes swl with both ends fork for turbine lp rotor as per specf
Supply of double part endless wire rope sling as per specification attached,supply of sling with both end reeving, 6 x 37 fibre core construction as per specification attached,hp turbine turn buckle of min. 10 tonnes swl with both ends fork for turbine hp rotor as per specf,lp turbine turn buckle of min. 40 tonnes swl with both ends fork for turbine lp rotor as per specf
Read moreof your Industry type