Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Alluminium Sheet Hard 1.22 Mm
|
| Description |
|
| Organisation | Department of Military Affairs | Ministry of Defence |
| Tender Id | GEM/2023/B/3586755 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://gem.gov.in/ |
| Start Date | June 19, 2023 17:49 |
| End Date |
Expired
29/06/2023
Expired 1200 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | BIRLA ELECTRICALS | - | 24-06-2023 17:48:54 | MII | Qualified |
| 2 | Evershine Enterprises | - | 28-06-2023 15:55:38 | MII | Qualified |
| 3 | National Auto Spares | - | 24-06-2023 17:09:34 | MII | Qualified |
Financial Evaluation Results
| S.No. | Seller Name | Offered Item | Total Price | Rank |
|---|---|---|---|---|
| 1 | Evershine Enterprises(MII) | Item Categories : ALLUMINIUM SHEET HARD 1.22MM | 15422.60 | L1 |
| 2 | BIRLA ELECTRICALS (MII) | Item Categories : ALLUMINIUM SHEET HARD 1.22MM | 15700.00 | L2 |
| 3 | National Auto Spares (MII) | Item Categories : ALLUMINIUM SHEET HARD 1.22MM | 15900.00 | L3 |
Procurement of acp panel and pre-coated gi sheet
Procurement of acp panel and pre-coated gi sheet
Read moreSuply of multi colour printing calender s with box, note book /(diary) and single sheet calender for the year 2027
Suply of multi colour printing calender s with box, note book /(diary) and single sheet calender for the year 2027
Read moreSuply of multi colour printing calender s with box, note book /(diary) and single sheet calender for the year 2027
Suply of multi colour printing calender s with box, note book /(diary) and single sheet calender for the year 2027
Read moreReplacement of damaged sheeting of godowns 1, 11 and iii nos and providing gi sheet roofing and painting to existing structures at market yard nereducherla under amc., nereducherla of suryapet district.
Replacement of damaged sheeting of godowns 1, 11 and iii nos and providing gi sheet roofing and painting to existing structures at market yard nereducherla under amc., nereducherla of suryapet district.
Read moreBtps-chp-reconditioning and hard facing of suspension center and end discs for ring granulator-2 and 4 of chp, btps from 01.08.2026 or actual date of commencement of work to 31.03.2027 as and when required in mm-ii subdivision of mm/chp/btps.
Btps-chp-reconditioning and hard facing of suspension center and end discs for ring granulator-2 and 4 of chp, btps from 01.08.2026 or actual date of commencement of work to 31.03.2027 as and when required in mm-ii subdivision of mm/chp/btps.
Read moreConstruction of meeting hall on 6th floor with puf panel sheet roofing of newly constructed tgspdcl (g+5 floors) building located at the extreme south-west corner outside the secretariat complex premises, mint compound, hyderabad (reserved for st category)
Construction of meeting hall on 6th floor with puf panel sheet roofing of newly constructed tgspdcl (g+5 floors) building located at the extreme south-west corner outside the secretariat complex premises, mint compound, hyderabad (reserved for st category)
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreof your Industry type