Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Complete Repairing / Reconditioning Of 3.3 Kv Ocb Switch, 400 Amp, Make Bharat Bijlee, S/N Sgw 2 Installed At Ht Room For Proper Power Supply To Oversize Restriction Plant And Ii) 3.3 Kv Ocb Switch Make Kirloskar, S/N 401001 34 Installed At Main Sub
|
| Description |
Complete Repairing / Reconditioning Of 3.3 Kv Ocb Switch, 400 Amp, Make Bharat Bijlee, S/N Sgw 2 Installed At Ht Room For Proper Power Supply To Oversize Restriction Plant And Ii) 3.3 Kv Ocb Switch Make Kirloskar, S/N 401001 34 Installed At Main Sub
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_CCL_332278_1 |
|
Reference Number |
SGW/KTA/ENM/E-Tender/24-25/105 Date 12.03.2025 |
| Tender Fee | 0 |
| EMD | 2900 |
| Tender Value | - |
| Place | Office of the Project Officer, Sawang Washery |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=344464 |
| Start Date | March 13, 2025 16:30 |
| End Date |
Expired
22/03/2025
Expired 570 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Spares suitable for siemens make 420 kv,2000amps,tp 415v motor operated centre break isolator with single earth switch type 400 kv hcb installed at 400 kv switchyard
Spares suitable for siemens make 420 kv,2000amps,tp 415v motor operated centre break isolator with single earth switch type 400 kv hcb installed at 400 kv switchyard
Read more(a) erection /dismantling of poles along with conductors and other associated accessories 3.3 kv o/h line (feeder 1, feeder 2 , feeder 3 and feeder 4), and installation of 11 kv grade goab switch, installation of lighting transformer, switch shifting
(a) erection /dismantling of poles along with conductors and other associated accessories 3.3 kv o/h line (feeder 1, feeder 2 , feeder 3 and feeder 4), and installation of 11 kv grade goab switch, installation of lighting transformer, switch shifting
Read moreMaintenance of electrical installation in residential building/ non residential building at chandigarh. (repair and servicing of ht ocb/ vcb and lt equipments installed in 11 kv indoor substation at model jail, sector-51, chd.
As per nit
Read morePole, pcc, 9 m,fixt lighting, 230 v, 150 w, led, screw,cable, 1.1 kv, 2c, copper, pvc, 1.5 mm2, flexible,overload relay, thrml, 100-150 a,ictp switch, 415-550v, 32 a, 3 p,cable joint kit, 35mm2, copper, 3.3 v, 3 c,earth leakage relay, 50-750 ma with time lag with cbct,moving contact,fixed contact,potential transformer 550-220v, 50va
Pole, pcc, 9 m,fixt lighting, 230 v, 150 w, led, screw,cable, 1.1 kv, 2c, copper, pvc, 1.5 mm2, flexible,overload relay, thrml, 100-150 a,ictp switch, 415-550v, 32 a, 3 p,cable joint kit, 35mm2, copper, 3.3 v, 3 c,earth leakage relay, 50-750 ma with time lag with cbct,moving contact,fixed contact,potential transformer 550-220v, 50va
Read moreComplete repairing / reconditioning of 3.3kv ocb switch, 400amp, make-kirloskar installed at ht room for primary control of two ocb switch of plant and 3.3kv ocb switch, 400amp, make-bicollary, s/n-sgw-1(wnp) for power supply to oversize transformer
Complete repairing / reconditioning of 3.3kv ocb switch, 400amp, make-kirloskar installed at ht room for primary control of two ocb switch of plant and 3.3kv ocb switch, 400amp, make-bicollary, s/n-sgw-1(wnp) for power supply to oversize transformer
Read moreComplete repairing / reconditioning of 02 nos. 440v acb switch, make-l and t, s/n-i) sgw-1, 1000a installed oversize and ii) s/n-4, 1000a installed at deshaling plant of sawang washery.
Complete repairing / reconditioning of 02 nos. 440v acb switch, make-l and t, s/n-i) sgw-1, 1000a installed oversize and ii) s/n-4, 1000a installed at deshaling plant of sawang washery.
Read moreComplete repairing / reconditioning of 3.3kv ocb switch, 400amp, make-rerolled burn, s/n-wnp installed at main substation for controlling of plant 3.3kv grade capacitor bank and 11kv ocb switch, 400amp, make-gec, s/n-sgw-1 both installed at main subs
Complete repairing / reconditioning of 3.3kv ocb switch, 400amp, make-rerolled burn, s/n-wnp installed at main substation for controlling of plant 3.3kv grade capacitor bank and 11kv ocb switch, 400amp, make-gec, s/n-sgw-1 both installed at main subs
Read morePart repairing/ re-conditioning of 3.3 kv ocb switch, 400 a under kathara colliery
Part repairing/ re-conditioning of 3.3 kv ocb switch, 400 a under kathara colliery
Read morePart repairing/ re-conditioning of 3.3 kv ocb switch, 400 a under kathara colliery
Part repairing/ re-conditioning of 3.3 kv ocb switch, 400 a under kathara colliery
Read moreof your Industry type