Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
1)civil Work For Civil Work For Rationalization Of Process Layout Along With Relocation Of Machines For Wheel Shop
2)civil Work For Civil Work For Augmentation Wheel Attention And Handling Facilities.
3)civil Work For Civil Work For Transfer And Testing Line Along With Associated Workshop For Wagon Receipt, Testing And Dispatch.
4)civil Work For Improvement Of Facilities On Painting Line.
5)civil Work For Development Of Ctrb Unit Exchange/Sub Assembly Section And Work Station Adjacent To W
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 77887402 |
Reference Number |
07-2024-SrDENCo |
Tender Fee | 0 |
EMD | 6.71 Lakh |
Tender Value | |
Place | Mumbai CST |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/122024/77887402/viewNitPdf_4739069.pdf |
Start Date | December 07, 2024 00:28 |
End Date |
30/12/2024 ( Expired 190 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of 33 kv line with mvcc along with metering installation for new mother and child hospital under deposit work scheme of ulubari electrical sub-division on full turnkey mode.
Construction of 33 kv line with mvcc along with metering installation for new mother and child hospital under deposit work scheme of ulubari electrical sub-division on full turnkey mode.
Read moreAnnual maintenance contract for operations and maintenance of 2000 tr district cooling hvac chiller system along with associated components and 150 hp vrv system connected facilities including complaint management of all facilities
Tender for annual maintenance contract for operations and maintenance of 2000 tr district cooling hvac chiller system along with associated components and 150 hp vrv system connected facilities including complaint management of all facilities
Read moreDesign, supply, loading at workshop / factory, transport, unloading at site, erection, testing and commissioning of 33/6.6 kv switchyard equipments along with 2.5 mva transformer associated work for devri navegoan lis, tah - dist- gondia
Design, supply, loading at workshop / factory, transport, unloading at site, erection, testing and commissioning of 33/6.6 kv switchyard equipments along with 2.5 mva transformer associated work for devri navegoan lis, tah - dist- gondia
Read moreWork contract for housekeeping of main boiler area and associated building areas along with 220/400kv switchyard area, switchyard control room and associated building areas of unit 3 n 4 of 2x660 mw, ph-ii, sstpp, mppgcl, dongalia
Work contract for housekeeping of main boiler area and associated building areas along with 220/400kv switchyard area, switchyard control room and associated building areas of unit 3 n 4 of 2x660 mw, ph-ii, sstpp, mppgcl, dongalia
Read moreConstruction of windrow shed, providing machineries for existing swm plant, construction of scientific landfill site along with associated civil works with 6 months operation and maintenance at own cost at mouje. bhod tq. dist. akola
Construction of windrow shed, providing machineries for existing swm plant, construction of scientific landfill site along with associated civil works with 6 months operation and maintenance at own cost at mouje. bhod tq. dist. akola
Read moreAugmentation of 220kv switchyard infrastructure at iocl panipat refinery for meeting additional power demand of p25 project units along with associated statutory approvals and area development works.
Augmentation of 220kv switchyard infrastructure at iocl panipat refinery for meeting additional power demand of p25 project units along with associated statutory approvals and area development works.
Read moreConstruction of balance portion of 4 no bypass channel between chainage 12 and 17 for an approximate length of 140 meters along with other associated work at little rangit hydel project under mini micro hydel division, kurseong, dist. darjeeling
Construction of balance portion of 4 no bypass channel between chainage 12 and 17 for an approximate length of 140 meters along with other associated work at little rangit hydel project under mini micro hydel division, kurseong, dist. darjeeling
Read moreDeployment of 01 no.600 mt, 02 nos.400 mt and 01 no.250 mt capacity tyre mounted cranes with along with all accessories in complete in all respect pertaining to mechanical and associated facilities works tender for cold insulated pipeline
Deployment of 01 no.600 mt, 02 nos.400 mt and 01 no.250 mt capacity tyre mounted cranes with along with all accessories in complete in all respect pertaining to mechanical and associated facilities works tender for cold insulated pipeline
Read moreConstruction of 33 kv ug line with xlpe cable along with metering installation for new mother and child hospital under deposit work scheme of ulubari electrical sub-division on full turnkey mode.
Construction of 33 kv ug line with xlpe cable along with metering installation for new mother and child hospital under deposit work scheme of ulubari electrical sub-division on full turnkey mode.
Read moreRate contract for supply, erection/creation, testing and commissioning 100 kva transformer substation along with laying of htand lt line on turnkey basis
Rate contract for supply, erection/creation, testing and commissioning 100 kva transformer substation along with laying of htand lt line on turnkey basis
Read moreof your Industry type