Tender Details
Particulars | Details |
---|---|
Title |
Ttps Es Circle Em I Rewinding Of 5 Nos Lt 3 Phase 415 V 1 2k W Cooler Fan Motors Of Single Phase Generator Transformer At Unit Iii
|
Description |
Ttps Es Circle Em I Rewinding Of 5 Nos Lt 3 Phase 415 V 1 2k W Cooler Fan Motors Of Single Phase Generator Transformer At Unit Iii
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_529724_1 |
Reference Number |
CE/SE/ES/TTPS/No.297/2024-25 |
Tender Fee | 0 |
EMD | 300 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=630721 |
Start Date | March 07, 2025 19:30 |
End Date |
24/03/2025 ( Expired 27 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Repairing and rewinding of 03 nos. h.t. induction motors, i) rating 223 kw, 3.3 kv, make ngef, ii) rating 375 kw, 3.3 kv, make crompton greaves and iii) rating 1130 kw, 6.6 kv, make cg power of pump section at dipka expansion project.
Repairing and rewinding of 03 nos. h.t. induction motors, i) rating 223 kw, 3.3 kv, make ngef, ii) rating 375 kw, 3.3 kv, make crompton greaves and iii) rating 1130 kw, 6.6 kv, make cg power of pump section at dipka expansion project.
Read moreDetailed design, engineering, supply, installation, testing and commissioning of rack and pinion type stack elevator for 2 nos. of 150 meter high reinforced concrete single steel flue chimney unit 1 2 of fgd system at 3 660 mw north karanpura
Detailed design, engineering, supply,
 installation testing and commissioning of rack
 and pinion type stack elevator for 2 nos. of 150
 meter high reinforced concrete single steel flue
 chimney unit 1 2 of fgd system at 3 660
 mw north karanpura
Read moreM and r to eds / wss/ at taloja indl. area ,ttc indl area , wagle boosting station providing maintenance services to lt panels and starter in pumphouse along with rewinding ,servicing and overhauling of 3 phase induction motors at taloja eds
M and r to eds / wss/ at taloja indl. area ,ttc indl area , wagle boosting station providing maintenance services to lt panels and starter in pumphouse along with rewinding ,servicing and overhauling of 3 phase induction motors at taloja eds
Read moreRepairing/rewinding of ac generator 35 kva, 3 phase, 415v, 50 hz, sl no. 98e33500-45, make - kirloskar electric installed on tmc (up64 at 2642) at bina project
Repairing/rewinding of ac generator 35 kva, 3 phase, 415v, 50 hz, sl no. 98e33500-45, make - kirloskar electric installed on tmc (up64 at 2642) at bina project
Read moreComplete repairing rewinding of stator of 75kw, 3 phase, 415v motor, 1480 rpm, make crompton greaves, sl. no. arl 531 installed at main sump and repairing rewinding of 02 nos. of stator of 22kw, 415v, 38a, 1465 rpm induction motor
Complete repairing rewinding of stator of 75kw, 3 phase, 415v motor, 1480 rpm, make crompton greaves, sl. no. arl 531 installed at main sump and repairing rewinding of 02 nos. of stator of 22kw, 415v, 38a, 1465 rpm induction motor
Read moreConstruction of road over bridge in lieu of existing lc.no.5 in between irugur - peelamedu railway stations at railway km 3/21-23 on neelikonampalayam - sihs colony road at km 1/6 near sihs colony (phase-i km 0/0-1/0)
Construction of road over bridge in lieu of existing lc.no.5 in between irugur - peelamedu railway stations at railway km 3/21-23 on neelikonampalayam - sihs colony road at km 1/6 near sihs colony (phase-i km 0/0-1/0)
Read moreTtps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 59000 mt fly ash in unit i to v from the date of handing over of site
Ttps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 59000 mt fly ash in unit i to v from the date of handing over of site
Read moreTtps- echp-i-dismantling and rewinding of failed 3 phase ac 415v 7.5kw induction motor of 10t electrical hoist e4 at secondary crusher house-i
Ttps- echp-i-dismantling and rewinding of failed 3 phase ac 415v 7.5kw induction motor of 10t electrical hoist e4 at secondary crusher house-i
Read moreTtps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 58000 mt fly ash in unit i to v from the date of handing over of site
Ttps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 58000 mt fly ash in unit i to v from the date of handing over of site
Read moreSemi comprehensive amc for seven nos techno make, thyssen krupp make and mekaster make elevators installed at service building, boiler unit-1 to 4 and chimney of phase-i and ii of ctpp chhabra.
Semi comprehensive amc for seven nos techno make, thyssen krupp make and mekaster make elevators installed at service building, boiler unit-1 to 4 and chimney of phase-i and ii of ctpp chhabra.
Read moreof your Industry type