Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Demolition Of Top Slab, Desilting And Construction Of New Slab Due To Blockage Of Drain At Uthamar Gandhi Salai (Jn Of Vallu Kottam High Road) In Division 113, Unit 26 ,Zone 09
|
| Description |
Demolition Of Top Slab, Desilting And Construction Of New Slab Due To Blockage Of Drain At Uthamar Gandhi Salai (Jn Of Vallu Kottam High Road) In Division 113, Unit 26 ,Zone 09
|
| Organisation | Corporation of Chennai | State Govt. and UT |
| Tender Id | 2024_CoC_482351_1 |
|
Reference Number |
Z.O.9.C.No.E1/6101/2024 |
| Tender Fee | 0 |
| EMD | 3600 |
| Tender Value | - |
| Place | Zone 9 (Nungambakkam) |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=573157 |
| Start Date | September 10, 2024 23:30 |
| End Date |
Expired
12/09/2024
Expired 721 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Demolition of top slab, desilting and construction of new slab due to blockage of drain at krishnabai street (from sharadambal street jn to balaji avenue 1st street jn) in division-113, unit-26, zone-09
Demolition of top slab, desilting and construction of new slab due to blockage of drain at krishnabai street (from sharadambal street jn to balaji avenue 1st street jn) in division-113, unit-26, zone-09
Read moreDemolition of top slab, desilting and construction of new slab due to blockage of entire drain at kumarappa street in division-113,unit-26,zone-09
Demolition of top slab, desilting and construction of new slab due to blockage of entire drain at kumarappa street in division-113,unit-26,zone-09
Read moreDemolition of top slab, desilting and construction of new top slab due to blockage of nungambakkam canal mouth portion in division-113, unit-26, zone 09
Demolition of top slab, desilting and construction of new top slab due to blockage of nungambakkam canal mouth portion in division-113, unit-26, zone 09
Read moreImprovement to the existing strom water drain at uthamar ganthi salai (vallukottam high road to cannal) in division-113, unit-26, zone-09
Improvement to the existing strom water drain at uthamar ganthi salai (vallukottam high road to cannal) in division-113, unit-26, zone-09
Read moreDemolition of top slab, desilting and fixing of new manhole door to blockage of entire drain at habibullah road in division-113,unit-26,zone-09
Demolition of top slab, desilting and fixing of new manhole door to blockage of entire drain at habibullah road in division-113,unit-26,zone-09
Read moreProviding silt catch pit at uthamar gandhi salai in division-113, unit-26, zone-09
Providing silt catch pit at uthamar gandhi salai in division-113, unit-26, zone-09
Read moreDismantling of top slab, desilting and providing new top slab to storm water drain of size 600mm x750mm rcc drain at krishnama road (from pragathammbal road to uthamar gandhi salai) in dn-113, unit-26, zone-9
Dismantling of top slab, desilting and providing new top slab to storm water drain of size 600mm x750mm rcc drain at krishnama road (from pragathammbal road to uthamar gandhi salai) in dn-113, unit-26, zone-9
Read moreHandling ,transport and other mining services - percentage quote based - desilting of jn salai drai
Read more
Handling ,transport and other mining services - percentage quote based - desilting of jn salai drai
Read more
Providing green sun shadow (15 x 10m) at dr.mgr salai (jn thirumalai pillai road) in division -113, unit -26, zone - 09
Providing green sun shadow (15 x 10m) at dr.mgr salai (jn thirumalai pillai road) in division -113, unit -26, zone - 09
Read moreof your Industry type