Tender Details
Particulars | Details |
---|---|
Title |
Full Flexible Gear Coupling, Lovejoy, Lfg111,Full Flexible Gear Coupling, Lovejoy, Lfg109,Full Flex
|
Description |
|
Organisation | COAL INDIA LIMITED | Ministry of Coal |
Tender Id | GEM/2025/B/6160405 |
Reference Number |
|
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link | https://bidplus.gem.gov.in/all-bids |
Start Date | April 22, 2025 23:25 |
End Date |
14/05/2025 ( Expired 28 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Procurement of spares and complete assembly for sleeve coupling for dry ash lines ntpc unchahar
Procurement of spares and complete assembly for sleeve coupling for dry ash lines ntpc unchahar
Read moreRepairing of planetary gear box of bowl mill xrp 903 of unit 8 n 9, dtps htps, kasimpur, aligarh
Overhauling, servicing and testing of planetary gear box of bowl mill &#x0d xrp 903 of unit-8 and 9, dtps htps, kasimpur, aligarh
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation of existing intermediate lane flexible pavement to 2l with ps from km 0.00 to km 75.00 on orchha tikamgarh shahgarh nh 539 in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation of existing intermediate lane flexible pavement to 2l with ps from km 0.00 to km 75.00 on orchha tikamgarh shahgarh nh 539 in the state of madhya pradesh on epc mode.
Read moreUpgradation of existing intermediate lane flexible pavement to 2 lane with paved shoulders flexible pavement from km 0.000 (orchha) to km 75.000 (length 75.000 km) on orchha tikamgarh shahgarh nh-539 in the state of madhya pradesh on epc mode
Upgradation of existing intermediate lane flexible pavement to 2 lane with paved shoulders flexible pavement from km 0.000 (orchha) to km 75.000 (length 75.000 km) on orchha tikamgarh shahgarh nh-539 in the state of madhya pradesh on epc mode
Read moreOverhauling of condensate extraction pumps weir make and hydraulic coupling voith make for unit 3 of 3x210mw, atps anpara
Overhauling of condensate extraction pumps weir make and hydraulic coupling voith make for unit 3 of 3x210mw, atps anpara
Read moreProcurement of antifriction metal conditioner (lubricant additive) for gear box oil of coal mill of unit no. 10 and 11 stps, sarni.
Procurement of antifriction metal conditioner (lubricant additive) for gear box oil of coal mill of unit no. 10 and 11 stps, sarni.
Read moreComputer power supply,cat 6 full copper cable,ofc fiber cable 6 core outdoor armoured,acer mother b
Read more
Inviting rates for flex baner and other printing for the financial year 2025-26
Inviting rates for flex baner and other printing for the financial year 2025-26
Read moreof your Industry type