Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Procurement Of 6 Numbers Of Top Bracket Oil Coolers And 4 Numbers Of Bottom Bracket Oil Coolers At Kakkad Hep, Seethathode
|
| Description |
Procurement Of 6 Numbers Of Top Bracket Oil Coolers And 4 Numbers Of Bottom Bracket Oil Coolers At Kakkad Hep, Seethathode
|
| Organisation | Kerala State Electricity Board | State Govt. and UT |
| Tender Id | 2025_KSEB_770551_1 |
|
Reference Number |
DCE-MZR/AE-2/TB-38/2025-26/01 Dated 19.06.2025 |
| Tender Fee | 5900 |
| EMD | 1.01 Lakh |
| Tender Value | - |
| Place | Kakkad HEP, Seethathode, Pathanmathitta, Kerala |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1294892 |
| Start Date | August 16, 2025 22:30 |
| End Date |
Expired
01/09/2025
Expired 405 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
On-site laser measurement work on slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
On-site laser measurement work on slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
Read moreOn-site resin grouting work for slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
On-site resin grouting work for slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
Read moreCapital work of kakkad hep - replacement of francis turbine runner of 25mw generator unit#2 of kakkad hydro electric project, seethathode
Capital work of kakkad hep - replacement of francis turbine runner of 25mw generator unit#2 of kakkad hydro electric project, seethathode
Read moreAngle lh-top,angle rh-top,angle rh-bottom,angle -bottom,angle lh-bottom,bracket,bracket-lh,bracket-
Read more
Angle lh-top,angle rh-top,angle rh-bottom,angle -bottom,angle lh-bottom,bracket,bracket-lh,bracket-
Read more
Bracket for bottom roller; 1400mm,bracket for top roller; 1400mm,bracket for top impact roller; 180
Read more
Repairing of self aligning brackets (top bracket) and (bottom bracket) for conveyors at rls, bocp.
Repairing of self aligning brackets (top bracket) and (bottom bracket) for conveyors at rls, bocp.
Read moreSelf aligning carring bracket top roller 1200mm,self aligning return bracket bottom roller 1200mm,c
Read more
of your Industry type