Tender Details
Particulars | Details |
---|---|
Title |
Ttps Operation Circle Mpm Ii Acp Attending Emergency Works In Condenser, Chiller Pumps, Cw Pumps, Cw Pipe Lines, Cleaning Of Ac Plant Equipments, Assisting Shift Operators In Changeover Of Running Equipments Etc., In Ac Plant Air Washer System Etc
|
Description |
Ttps Operation Circle Mpm Ii Acp Attending Emergency Works In Condenser, Chiller Pumps, Cw Pumps, Cw Pipe Lines, Cleaning Of Ac Plant Equipments, Assisting Shift Operators In Changeover Of Running Equipments Etc., In Ac Plant Air Washer System Etc
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_527363_1 |
Reference Number |
CE/SE/O/TTPS/Spec.No.56/25-26 |
Tender Fee | 0 |
EMD | 11200 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=627992 |
Start Date | February 24, 2025 19:30 |
End Date |
10/03/2025 ( Expired 42 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Mtps i mill plant centralised ac plant attending breakdown works in ac compressor no 2 and 3 ac cooling tower fans air handling units air washer system circulating water pumps pipe lines and valves etc for a period of 365 days
Mtps i mill plant centralised ac plant attending breakdown works in ac compressor no 2 and 3 ac cooling tower fans air handling units air washer system circulating water pumps pipe lines and valves etc for a period of 365 days
Read moreTtps operation circle mpm i attending to prive and breakdown maintenance works in the 7.5 ton capacity eot cranes of unit i, ii iii mill plant for the period from 01.04.2025 to 31.03.2026
Ttps operation circle mpm i attending to prive and breakdown maintenance works in the 7.5 ton capacity eot cranes of unit i, ii iii mill plant for the period from 01.04.2025 to 31.03.2026
Read moreTtps operation circle cad cwph i upkeepement and attending minor repair works for ensuring uninterrupted and smooth running of cooling water pumps and tws in unit i, ii and iii for the period from 01.04.2025 to 31.03.2026
Ttps operation circle cad cwph i upkeepement and attending minor repair works for ensuring uninterrupted and smooth running of cooling water pumps and tws in unit i, ii and iii for the period from 01.04.2025 to 31.03.2026
Read moreTtps operation circle mpm ii acp attending emergency works in condenser, chiller pumps, cw pumps, cw pipe lines, cleaning of ac plant equipments, assisting shift operators in changeover of running equipments etc., in ac plant air washer system etc
Ttps operation circle mpm ii acp attending emergency works in condenser, chiller pumps, cw pumps, cw pipe lines, cleaning of ac plant equipments, assisting shift operators in changeover of running equipments etc., in ac plant air washer system etc
Read moreTtps operation circle cad cwph ii upkeepment and attending minor repair works in cooling water pump house ii, sea water pumps available in filtration plant of cwph ii for the period from 01.04.2025 to 31.03.2026
Ttps operation circle cad cwph ii upkeepment and attending minor repair works in cooling water pump house ii, sea water pumps available in filtration plant of cwph ii for the period from 01.04.2025 to 31.03.2026
Read moreTtps mech ii bm rubber lining in pressure vessels alkali and acid dg water storage tanks and pipe lines etc during breakdown overhaul of equipments in dm plant i ii for the period from 01 04 2025 to 31 03 2026
Ttps mech ii bm rubber lining in pressure vessels alkali and acid dg water storage tanks and pipe lines etc during breakdown overhaul of equipments in dm plant i ii for the period from 01 04 2025 to 31 03 2026
Read moreTtps operation circle cad foph attending prive maintenance of fuel oil pump house equipments and line patrolling and removing the inflammable materials in and around pipe lines and storage tanks heavy oil ioc pumping lines and supply lines
Ttps operation circle cad foph attending prive maintenance of fuel oil pump house equipments and line patrolling and removing the inflammable materials in and around pipe lines and storage tanks heavy oil ioc pumping lines and supply lines
Read moreTtps operation circle mpm ii acp stage i, ii, iii cleaning of filters, cooling coils, condensers, cooling towers and greasing of bearings in ac plants and periodical overhauling of pumps, equipments from 01.04.2025 to 31.03.2026
Ttps operation circle mpm ii acp stage i, ii, iii cleaning of filters, cooling coils, condensers, cooling towers and greasing of bearings in ac plants and periodical overhauling of pumps, equipments from 01.04.2025 to 31.03.2026
Read moreTtps operation circle mpm ii acp repairs and replacement of failed compressor in ac split ac renewal of worn out bed assembly, tinkering of outer cover and other related breakdown works for a period from 01.04.2025 to 31.03.2026
Ttps operation circle mpm ii acp repairs and replacement of failed compressor in ac split ac renewal of worn out bed assembly, tinkering of outer cover and other related breakdown works for a period from 01.04.2025 to 31.03.2026
Read moreTtps operation circle mpm ii acp stage i, ii iii attending break down works in ac plant unit i to v, switch yard compressors etc. for a period from 01.04.2025 to 31.03.2026
Ttps operation circle mpm ii acp stage i, ii iii attending break down works in ac plant unit i to v, switch yard compressors etc. for a period from 01.04.2025 to 31.03.2026
Read moreof your Industry type