Tender Details

Particulars Details
Title
Sitc Of 2 Hp Submersible Motor Pump
Description
Sitc Of 2 Hp Submersible Motor Pump For Security Coy Infront Block No 11 Of Cgo Complex Under Fhq Bsf New Delhi
Organisation Border Security Force | Central Govt. Ministry/Department
Tender Id 2025_BSF_788727_1
Reference
Number
148/308/D-IV/Engg/BSF/2024
Tender Fee 0
EMD 0
Tender Value
Place HQ DG BSF 10 CGO Complex Lodhi Road New Delhi
Link https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1093100
Start Date February 13, 2025 15:30
End Date

19/02/2025 ( Expired 114 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Procurement of oil cooler for ash slurry pump for ahd gadarwara

Procurement of oil cooler for ash slurry pump for ahd gadarwara

Read more
Design, supply, install, test and commission innovative and immersive 3d projection mapping at thirumalai nayakkar mahal, madurai (package-2) with operations and maintenance for a period of 10 years on ppp basis

Design, supply, install, test and commission innovative and immersive 3d projection mapping at thirumalai nayakkar mahal, madurai (package-2) with operations and maintenance for a period of 10 years on ppp basis

Read more
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.

Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.

Read more
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham

Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham

Read more
Upgradation of shahgarh buxwaha narsinghgarh damoh section of nh-34 (from ch 113/00 to ch 176/500) to 2-lps in the state of madhya pradesh on epc mode

Upgradation of shahgarh buxwaha narsinghgarh damoh section of nh-34 (from ch 113/00 to ch 176/500) to 2-lps in the state of madhya pradesh on epc mode

Read more
Procurement of 03 nos. 18.5 kw 415v motors for bottom ash overflow transfer pump (botp), stps, sarni

Procurement of 03 nos. 18.5 kw 415v motors for bottom ash overflow transfer pump (botp), stps, sarni

Read more
Consultancy services for preparation of dpr for widening to 4lane from km 35.00 to km 66.275 from nalagarh to swarghat of nh 105 and spur in the state of hp.

Consultancy services for preparation of dpr for widening to 4lane from km 35.00 to km 66.275 from nalagarh to swarghat of nh 105 and spur in the state of hp.

Read more
Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand

Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand

Read more
Phase-2 - driver and final stage amplifiers for 2 sets of

Phase-2 - driver and final stage amplifiers for 2 sets of&#x0d iter icrf sources

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise