Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Metallic Expansion Bellow
|
| Description |
Metallic Expansion Bellow
|
| Organisation | Bharat Heavy Electricals Limited | Public Sector Undertakings |
| Tender Id | 2024_BHEL_41516_1 |
|
Reference Number |
E-304-24-0426-61-1 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | BHEL VARANASI |
| Link |
View Original Tender Notice
https://eprocurebhel.co.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=43260 |
| Start Date | November 02, 2024 16:30 |
| End Date |
Expired
12/11/2024
Expired 698 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Expansion of academic section 2 at 2nd floor of old opd block, nims
Expansion of academic section 2 at 2nd floor of old opd block, nims
Read moreDifferent sizes of rubber expansion joints (bellows) in water system of cam division of ktps-vi stage
Different sizes of rubber expansion joints (bellows) in water system of cam division of ktps-vi stage
Read moreExpansion and extra floor of community hall near rajalingam garden, ward no.4(under sdf scheme) (6th recall)
Expansion and extra floor of community hall near rajalingam garden, ward no.4(under sdf scheme) (6th recall)
Read moreProviding barbed wire fencing along the boundary of diverted forest land and boundary of srp oc-ii expansion project mine, srirampur area, mancherial dist., t.g.
Providing barbed wire fencing along the boundary of diverted forest land and boundary of srp oc-ii expansion project mine, srirampur area, mancherial dist., t.g.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreof your Industry type