Tender Details
Particulars | Details |
---|---|
Title |
Storm Water Drain Cleaning At Industrial Area Pithampur Sez Phase I And Ii, Distt. Dhar
|
Description |
Storm Water Drain Cleaning At Industrial Area Pithampur Sez Phase I And Ii, Distt. Dhar
|
Organisation | MP Industrial Development Corporation Limited | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 6195 |
EMD | 38500 |
Tender Value | |
Place | Pithampur SEZ |
Link |
AAAAAAAAAA Login to view |
Start Date | May 15, 2025 14:30 |
End Date |
31/05/2025 ( 15 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply, installation, testing and commissioning of electrical panels, cables and construction of rcc trenches for functionality of phase-i technical labs at barc near visakhapatnam, a.p.
Supply, installation, testing and commissioning of electrical panels, cables and construction of rcc trenches for functionality of phase-i technical labs at barc near visakhapatnam, a.p.
Read moreIt addl. pune infotech park i industrial
Construction of 6 lane road using cement&#x0d concrete treatment with footpath and storm water pipeline&#x0d repairing and providing new curbing at center verge and&#x0d road furnitures from shivaji chowk to smashan bhumi&#x0d
Read moreIt addl pune infotech park ii industrial area rajiv gandhi infotech park phase ii... construction
It addl pune infotech park ii industrial area rajiv gandhi infotech park phase ii... construction&#x0d of flyover at laxmi chowk hinjawadi pune&#x0d
Read moreDemolition and reconstruction of certain omqs at af stn halwara (phase-i)
Demolition and reconstruction of certain omqs at af stn halwara (phase-i)
Read moreBalance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Read moreDesign manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Read moreProcurement for temperature elements (rtd, thermocouple) installed in air and flue gas path and pulverisers in boiler area at 2x660 mw, sstpp, mppgcl, khandwa/etni-ii
Procurement for temperature elements (rtd, thermocouple) installed in air and flue gas path and pulverisers in boiler area at 2x660 mw, sstpp, mppgcl, khandwa
Read moreBiennial contract for stage i both units 2x300mw for cleaning and housekeeping of boiler and coal mill and other adjacent area and engagement of helpers to assist in mechanical operation job and disposal of mill reject or ash or debris by tractor
Biennial contract for stage i both units 2x300mw for cleaning and housekeeping of boiler and coal mill and other&#x0d adjacent area and engagement of helpers to assist in mechanical operation job and disposal of mill reject or ash&#x0d or debris by tractor
Read moreDnit for prov tap conn to consumers ext aug and regabilitation of water supply system installation of 05 nos nnew tube wells const of new ohsr 0 50 lg and repair of existing tube wells and pump chamber at gurdaspur distt gurdaspur under amrut 2 0
Dnit for prov tap conn to consumers ext aug and regabilitation of water supply system installation of 05 nos nnew tube wells const of new ohsr 0 50 lg and repair of existing tube wells and pump chamber at gurdaspur distt gurdaspur under amrut 2 0
Read moreConstruction of common intake for jaipur, ajmer and tonk districts and laying of the raw water main pipeline under the bisalpur jaipur water supply project, stage-ii phase-ii
Construction of common intake for jaipur, ajmer and tonk districts and laying of the raw water main pipeline under the bisalpur jaipur water supply project, stage-ii phase-ii&#x0d name of subwork- construction of 1000 mld intake pump house for jaipur an
Read moreof your Industry type