Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Outsourcing Of Maintenance Of The Psi( Power Supply Installation) Assets And Other Auxiliary Activities In Pratapnagar Dabhoi Kevadiya, Dabhoi Jobat , &Amp Dabhoi Miyagam Sections Of Vadodara Division For A Period Of Two(02) Years
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 77885711 |
Reference Number |
EL-TRD-TENDER-24-25-11 |
Tender Fee | 0 |
EMD | 1.64 Lakh |
Tender Value | |
Place | Mumbai |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/112024/77885711/viewNitPdf_4738916.pdf |
Start Date | October 11, 2024 17:10 |
End Date |
19/11/2024 ( Expired 215 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design, engineering, supply, installation, commissioning, own, operation and maintenance for a period of 40 years of 4x250 kw surface hydrokinetic power plant at tail race channel of kotla hydro power station, bbmb under resco mode
Design, engineering, supply, installation, commissioning, own, operation and maintenance for a period of 40 years of 4x250 kw surface hydrokinetic power plant at tail race channel of kotla hydro power station, bbmb under resco mode
Read moreSurvey, design, manufacture, supply, installation, testing and commissioning with five years comprehensive maintenance contract of total 97 kw capacity grid- connected spv power plant with net metering at various 12 police stations in nandurbar di
Survey, design, manufacture, supply, installation, testing and commissioning with five years&#x0d comprehensive maintenance contract of total 97 kw&#x0d capacity grid- connected spv power plant with net&#x0d metering at various 12 police stations in nandurbar di
Read moreSupply, installation, testing and commissioning (sitc) of 03 nos of automatic weather stations for chamera-1 dam including 03 years comprehensive annual maintenance contract (camc) after 02 years of warranty period.
Supply, installation, testing and commissioning (sitc) of 03 nos of automatic weather stations for chamera-1 dam including 03 years comprehensive annual maintenance contract (camc) after 02 years of warranty period.
Read moreSurvey design fabrication supply installation and commissioning of total 5 kva on grid connected rooftop solar pv power plant including comprehensive maintenance contract cmc for the period of 3 years from the date of commissioning
Survey design fabrication supply installation and commissioning of total 5 kva on grid connected rooftop solar pv power plant including comprehensive maintenance contract cmc for the period of 3 years from the date of commissioning
Read moreSupply, installation and commissioning of floating trash skimmer and waste removal machine with weed cutting arrangement (aquatic weed removal machine) including o and m services for a period of two (02) years in prayagraj city (u.p) for pma
Supply, installation and commissioning of floating trash skimmer and waste removal machine with weed cutting arrangement (aquatic weed removal machine) including o and m services for a period of two (02) years in prayagraj city (u.p) for pma
Read moreMaintenance of internal roads for two (02) years time period in sector- 1 to 14 of dronagiri node, navi mumbai.
Maintenance of internal roads for two (02) years time&#x0d period in sector -1 to 14 of dronagiri node, navi mumbai
Read moreSupply, installation, testing and commissioning (sitc) of 02 nos. of automatic rain gauges for chamera-1 dam including 03 years comprehensive annual maintenance contract (camc) after 02 years of warranty period
Supply, installation, testing and commissioning (sitc) of 02 nos. of automatic rain gauges for chamera-1 dam including 03 years comprehensive annual maintenance contract (camc) after 02 years of warranty period
Read moreConstruction of bench mark pillars, installation of surface prisms and measuring levels of all instruments installed at upper and lower dam sites of ppsp for a period of two (02) years
Construction of bench mark pillars, installation of surface prisms and measuring levels of all instruments installed at upper and lower dam sites of ppsp for a period of two (02) years&#x0d &#x0d
Read moreEpc basis for design engineering supply erection and installation along with commissioning of sewage treatment plant by septic tank elimination project inside dnpl township along with operation maintenance for period of 2 years
Epc basis for design engineering supply erection and&#x0d installation along with commissioning of sewage treatment plant by septic tank elimination project&#x0d inside dnpl township along with operation maintenance for period of 2 years
Read moreSupply, installation, testing and commissioning (sitc) of 4nos of strong motion accelerograph (sma) at dam site of dhauliganga power station including comprehensive annual maintenance contract (camc) for 5 years after the warrantee period of 1yr
Supply, installation, testing and commissioning (sitc) of 4nos of strong motion accelerograph (sma) at dam site of dhauliganga power station including comprehensive annual maintenance contract (camc) for 5 years after the warrantee period of 1yr
Read moreof your Industry type