Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Dismantling And Assembly Of End Shield, Seal Body And Associated Work For Arresting H2 Leakage At Ntpc Farakka Unit 1 Generator 200 Mw.
|
Description |
Dismantling And Assembly Of End Shield, Seal Body And Associated Work For Arresting H2 Leakage At Ntpc Farakka Unit 1 Generator 200 Mw.
|
Organisation | Bharat Heavy Electricals Limited | Central Govt. Ministry/Department |
Tender Id | 2024_BHEL_783207_1 |
Reference Number |
PSER-PUR-FKK-S588-24 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | NTPC FARAKKA UNIT-1 210 THW |
Link | https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1087410 |
Start Date | December 27, 2024 22:00 |
End Date |
30/12/2024 ( Expired 171 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Aoh kit ep contactor filter on/off. each consist of 7 items 8 nos. (1) cartridge body assly, aal part no. 2220007100/04 - 01 nos (2) rubber o ring valve housing, aal part no. 2220007100/06 - 02 nos (3) rubber o ring piston sm, aal part no. 2220007100/07 - 01 no (4) rubber o ring cylinder sm, aal part no. 2220007100/05 - 01 no. (5) rubber o ring air conn, aal part no. 2220007100/08 - 01 no. (6) seal piston sm, aal partno. 2220007100/09 - 01 no. (7) rubber cap, aal part no. 2220007100/10 - 0
For complete deion and other details, please refer to tender
Read moreSupply, delivery, fandi, dismantling, installation and commissioning of control and relay panel and its associated cables as per ts for upgradation of powergrid feeders that has served more than 25 years feeders at other sebs - nerts under add cap 2024-29 block
Supply, delivery, fandi, dismantling, installation and commissioning of control and relay panel and its associated cables as per ts for upgradation of powergrid feeders that has served more than 25 years feeders at other sebs - nerts under add cap 2024-29 block
Read moreWork contract for rubber liner work for cpu sevice vessels (tmd onsite) and various lines and vessels installed at dm plant and cpu regeneration area (tmd offsite) of unit 3 and 4, ph-ii, 2x660 mw, sstpp,mppgcl,dongalia.
Work contract for rubber liner work for cpu sevice vessels (tmd onsite) and various lines and vessels installed at dm plant and cpu regeneration area (tmd offsite) of unit 3 and 4, ph-ii, 2x660 mw, sstpp,mppgcl,dongalia.
Read moreRequest for expression of interest for debt financing of rs. 7,200 crores for setting up of 1 x 800 mw super critical unit (stage-ii) at pegadapalli village, jaipur mandal, mancherial district.
Request for expression of interest for debt financing of rs. 7,200 crore for setting up of 1 x 800 mw super critical unit (stage-ii) at pegadapalli village, jaipur mandal, mancherial district.
Read moreDesign engineering supply erection testing and commissioning of dcs based control system and associated works on epc mode for the project supply installation testing and commissioning of fgd system for 1x500 mw unit 6 ukai tps
Design engineering supply erection testing and commissioning of dcs based control system and associated works on epc mode for the project supply installation testing and commissioning of fgd system for 1x500 mw unit 6 ukai tps
Read moreConstruction of engineering hall-1 (back-end facility for lwr - llwmp)
Construction of engineering hall-1 (back-end facility for lwr - llwmp) and other miscellaneous works at barc, visakhapatnam, a.p.
Read moreService contract for refractory and insulation work de insulation and re insulation with sheet cladding work of different portion of boiler area different ducts pipe lines and valves etc under bmii dept during unit 3 overhauling at sgtpp
Service contract for refractory and insulation work de insulation and re insulation with sheet cladding work of different portion of boiler area different ducts pipe lines and valves etc under bmii dept during unit 3 overhauling at sgtpp&#x0d &#x0d &#x0d
Read moreComprehensive annual maintenance contract (camc) for hitachi-hirel make 2x 80 kva -2 sets ups system installed at unit# 1 and 2 ( 2x 250 mw),emerson make 2x 80 kva -2 sets ups system installed at unit# 3 and 4 ( 2x 250 mw) and mini ups system for p
Comprehensive annual maintenance contract (camc) for hitachi-hirel make 2x 80 kva -2 sets ups system installed at unit# 1 and 2 ( 2x 250 mw),emerson make 2x 80 kva -2 sets ups system installed at unit# 3 and 4 ( 2x 250 mw) and mini ups system for p
Read moreProvn of borewell for birsa munda lines at namkum pocket and basantar line unit area (otm and jcos/or md accn) of 1 jak li at morabadi pocket under ge ranchi
Provn of borewell for birsa munda lines at namkum pocket and basantar line unit area (otm and jcos/or md accn) of 1 jak li at morabadi pocket under ge ranchi
Read moreWork of dismantling, providing and fixing of razor barbed wire fencing for providing extra security precaution of s/s emergency spares at store of 400/220/132kv switchyard boundary wall and construction of security hut in 220/132kv s/y 400kv sub-stat
Work of dismantling, providing and fixing of razor barbed wire fencing for providing extra security precaution of s/s emergency spares at store of 400/220/132kv switchyard boundary wall and construction of security hut in 220/132kv s/y 400kv sub-stat
Read moreof your Industry type