Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
π Procurement Opportunity: Dewatering Services For Mumbai Cst Ru Bs π§π§οΈ The Ministry Of Railways, Specifically The Central Govt. Ministry/Department, Is Seeking Bids For The Dewatering Of Accumulated Water From Residual Underground Bunkers (Ru Bs) And Muck Cleaning During The Monsoon Season. π«οΈ The Scope Of Work Includes The Dewatering Of Ru Bs Under Aden/Klbg Sub Division, As Listed In Lc Numbers 75, 77, 80, 90, And 236, For A Period Of Two Years. π π Bid Submission Deadline: May 10, 2024, 3:00 Pm A Tender Fee Of Inr 52,900 Has Been Set, With An Earnest Money Deposit (Emd) Of Inr 2,64,500. π° Interested Bidders Must Review The Complete Tender Document For Detailed Requirements And Submission Guidelines. π Keywords: Dewatering Services, Mumbai Cst, Railway Bunkers, Monsoon, Government Tender, Ministry Of Railways, Central Govt. Ministry/Department, Emd, Tender, Procurement| Particulars | Details |
|---|---|
| Title |
Dewatering Of Accumulated Water From Ru Bs In Lieu Of Lc No.75,77,80,90,236 And Muck Cleaning During Monsoon In All Rub Under Aden/Klbg Sub Division For 2 Years.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 74829925 |
|
Reference Number |
14-2023-SrDENS |
| Tender Fee | 0 |
| EMD | 52900 |
| Tender Value | - |
| Place | Mumbai CST |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/052024/74829925/viewNitPdf_4551576.pdf |
| Start Date | April 27, 2024 00:22 |
| End Date |
Expired
10/05/2024
Expired 890 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of rub/lhs in lieu of lc no. 351 at km.688/25-27 between nia-akt under the jurisdiction of aden/central, bilaspur.
Construction of rub/lhs in lieu of lc no. 351 at km.688/25-27 between nia-akt under the jurisdiction of aden/central, bilaspur.
Read moreProvision of associated s&t work in connection with provision of rub in lieu of lc no. 03 (hufp-lljp), lc no. 9 c (gtht-lljp), lc no. 10 (lljp-vshi), lc no. 12 c (lljp-vshi), lc no. 13 c (lljp-vshi), lc no. 16 (lljp-vshi) & lc no. 18 (khi-grl) in see division .
Provision of associated s&t work in connection with provision of rub in lieu of lc no. 03 (hufp-lljp), lc no. 9 c (gtht-lljp), lc no. 10 (lljp-vshi), lc no. 12 c (lljp-vshi), lc no. 13 c (lljp-vshi), lc no. 16 (lljp-vshi) & lc no. 18 (khi-grl) in see division .
Read moreOhe modification work in connection with provision of new rob in lieu of lc gate no. nn-105 at kamg nunder aden/east/apdj.
Ohe modification work in connection with provision of new rob in lieu of lc gate no. nn-105 at kamg nunder aden/east/apdj.
Read moreOhe modification and other allied work in connection with accomodation of 12 coach memu and provision of rub in lieu of 5 lc in anand-khambat section
Ohe modification and other allied work in connection with accomodation of 12 coach memu and provision of rub in lieu of 5 lc in anand-khambat section
Read moreSpgr-ask section: proposed construction of differential height rub with cover shed at km 138/200-300 in lieu of lc no. 82 between rdi-ttr stations
Spgr-ask section: proposed construction of differential height rub with cover shed at km 138/200-300 in lieu of lc no. 82 between rdi-ttr stations
Read moreProvision of lhs 2.00 x 5.00 m x 5.00 m in lieu of lc no. b-58 at km 78/8-9 on the asr-ptk section under aden/ptk
Provision of lhs 2.00 x 5.00 m x 5.00 m in lieu of lc no. b-58 at km 78/8-9 on the asr-ptk section under aden/ptk
Read more(a) rajkot division - providing lhs in lieu of lc no. 92 at km 698/1-2 between lxr-wkr (b) rajkot division: provision of rub/lhs at lc no 26 (km 604/0-1), 33 (km 616/8-9), 41 (km 632/3-4), 42(633/9-634/0), 49 (km640/2-3) (c ) rajkot division:-viramgam -okha: - provision of rub/lhs at lc no 25 at km 602/9-603/0, (d) rajkot division: provision of rub/lhs at lc no 61 (km 657/4-5), 65 (km 663/2-3),66(664/5-6), 80(km 687/2-3), 81 (km 688/7-8), (e) rajkot division: provision of rub/lhs at lc
(a) rajkot division - providing lhs in lieu of lc no. 92 at km 698/1-2 between lxr-wkr (b) rajkot division: provision of rub/lhs at lc no 26 (km 604/0-1), 33 (km 616/8-9), 41 (km 632/3-4), 42(633/9-634/0), 49 (km640/2-3) (c ) rajkot division:-viramgam -okha: - provision of rub/lhs at lc no 25 at km 602/9-603/0, (d) rajkot division: provision of rub/lhs at lc no 61 (km 657/4-5), 65 (km 663/2-3),66(664/5-6), 80(km 687/2-3), 81 (km 688/7-8), (e) rajkot division: provision of rub/lhs at lc
Read more1) reconstruction of ty-ii staff quarters at arsikere (ask) (12 units) in lieu of quarters no. 12/a-d, 17/a-d & 29/a-d. 2) spgr-ask section: proposed construction of differential height rub with cover shed at km 138/200-300 in lieu of lc no. 82 between rdi-ttr stations.
1) reconstruction of ty-ii staff quarters at arsikere (ask) (12 units) in lieu of quarters no. 12/a-d, 17/a-d & 29/a-d. 2) spgr-ask section: proposed construction of differential height rub with cover shed at km 138/200-300 in lieu of lc no. 82 between rdi-ttr stations.
Read moreTrd work against various engg works over firozpur division in c/w (i)- elimination of manned l-xing no. s-63 at km 433/27-28 by providing limited height subway of internal size 5m x 5m on juc-bes section (between juc-srx) by pushing method in the section under aden/juc (ii)- provision of 3.00m wide covered light weight rob near lc no. s-3 on ldh-dui section under aden/ldh, (iii)- construction of 5m x 3.5m lhs in lieu of closed level crossing no. c-7 on juc-nro section by pushing method under a
Trd work against various engg works over firozpur division in c/w (i)- elimination of manned l-xing no. s-63 at km 433/27-28 by providing limited height subway of internal size 5m x 5m on juc-bes section (between juc-srx) by pushing method in the section under aden/juc (ii)- provision of 3.00m wide covered light weight rob near lc no. s-3 on ldh-dui section under aden/ldh, (iii)- construction of 5m x 3.5m lhs in lieu of closed level crossing no. c-7 on juc-nro section by pushing method under a
Read moreS&t work in c/w (1) repl. of steel girder with rcc slab of bridge no.102 up&dn, 111 up&dn, 119 up on juc-asr sec., b.no.180 on asr-att & br. no.103 on vka-dbnk section. (ii) construction of lhs of internal size 5 m x 3.5 m lhs in lieu of lc c-7 at km 4/13-14 on juc-nro section under aden-juc over firozpur division. (iii) construction of lhs of internal size 5.0 x 5.0m at manned l-xings no.a-5 on vka-dbnk section by pushing method in the section under aden-i/asr. (iv) constructi
S&t work in c/w (1) repl. of steel girder with rcc slab of bridge no.102 up&dn, 111 up&dn, 119 up on juc-asr sec., b.no.180 on asr-att & br. no.103 on vka-dbnk section. (ii) construction of lhs of internal size 5 m x 3.5 m lhs in lieu of lc c-7 at km 4/13-14 on juc-nro section under aden-juc over firozpur division. (iii) construction of lhs of internal size 5.0 x 5.0m at manned l-xings no.a-5 on vka-dbnk section by pushing method in the section under aden-i/asr. (iv) constructi
Read moreof your Industry type