Tender Details
Particulars | Details |
---|---|
Title |
Laying Of 110 Mm Dia P.V.C Pipe Line From Subba Rao Hospital To Fish Market Back Side In Mangala Palem In Division No.24 (3rd Call)
|
Description |
Laying Of 110 Mm Dia P.V.C Pipe Line From Subba Rao Hospital To Fish Market Back Side In Mangala Palem In Division No.24 (3rd Call)
|
Organisation | Information Technology, Electronics and Communications Andhra Pradesh | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 164 |
EMD | 4620 |
Tender Value | |
Place | AP |
Link |
AAAAAAAAAA Login to view |
Start Date | June 04, 2025 22:30 |
End Date |
11/06/2025 ( 4 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Laying of 110mm hdpe pipe line from near h/o shri shamim to near h/o shri chanda in moh-pathanpura w.n.-17, najibabad
Laying of 110mm hdpe pipe line from near h/o shri shamim to near h/o shri chanda in moh-pathanpura w.n.-17, najibabad
Read moreProviding laying and jointing of 80 mm dia and 50 mm dia g.i. pipe line with labor and material at site ward no. 50 file no. 04/25x9/1
Providing laying and jointing of 80 mm dia and 50 mm dia g.i. pipe line with labor and material at site ward no. 50 file no. 04/25x9/1
Read moreConstruction work of covered drain from sneh udyog to rp jewellers in yadav colony under division no. 02 kachpura kamala nehru ward.3rd call
Construction work of covered drain from sneh udyog to rp jewellers in yadav colony under division no. 02 kachpura kamala nehru ward.3rd call
Read moreConstruction of rcc culverts at sarada colony 14th and 15th lines and cc outfall drain to sarada colony main road from 13th line to 15th line (south side) in div no.50 under ae-6 section.
Construction of rcc culverts at sarada colony 14th and 15th lines and cc outfall drain to sarada colony main road from 13th line to 15th line (south side) in div no.50 under ae-6 section.
Read moreConstruction of rcc culverts at sarada colony 13th and 19th lines and cc outfall drain to sarada colony main road from 13th line to 14th line (north side) in div no.50 under ae-6 section
Construction of rcc culverts at sarada colony 13th and 19th lines and cc outfall drain to sarada colony main road from 13th line to 14th line (north side) in div no.50 under ae-6 section
Read moreLaying of 110 mm hdpe pipe line from chairman sahab furniture store to master nandram house mohalla kila bharat nagar length 640 mtr./dr. rizwan house to jahir house mohalla hasanpura length 330 mtr total length 970 mtr. kiratpur.
Laying of 110 mm hdpe pipe line from chairman sahab furniture store to master nandram house mohalla kila bharat nagar length 640 mtr./dr. rizwan house to jahir house mohalla hasanpura length 330 mtr total length 970 mtr. kiratpur.
Read moreLaying of 100mm dia gi pipe line from new tube well in shivpuri west to kaziana masjid
Laying of 100mm dia gi pipe line from new tube well in shivpuri west to kaziana masjid
Read moreRemodeling of lift irrigation scheme patta brawary in gp brawary tehsil and distt solan sh construction of percolation well providing laying jointing testing and commissioning of rising main of gi pipe medium grade 150 mm dia conforming to bis 1239
Remodeling of lift irrigation scheme patta brawary in gp brawary tehsil and distt solan sh construction of percolation well providing laying jointing testing and commissioning of rising main of gi pipe medium grade 150 mm dia conforming to bis 1239
Read moreWork of laying 160 mm hdpe pipe line from chhipi chowk to kalwa house in ward no. 3 of mo. gandhinagar length 160 m
Work of laying 160 mm hdpe pipe line from chhipi chowk to kalwa house in ward no. 3 of mo. gandhinagar length 160 m
Read moreProviding laying and jointing of 50 and 80 mm dia for replacement of damaged g.i. pipe line with labor and material at site ward no. 50 file no. 144/25x9/1
Providing laying and jointing of 50 and 80 mm dia for replacement of damaged g.i. pipe line with labor and material at site ward no. 50 file no. 144/25x9/1
Read moreof your Industry type