Tender Details
Particulars | Details |
---|---|
Title |
Sdp Pamba Cleaning The Premises Of Pamba, Traditional Route And Swami Ayyappan Road In Connection With Temple Opening Days Of Monthly Pooja From March 2025 To October 2025
|
Description |
Sdp Pamba Cleaning The Premises Of Pamba, Traditional Route And Swami Ayyappan Road In Connection With Temple Opening Days Of Monthly Pooja From March 2025 To October 2025
|
Organisation | Travancore Devaswom Board | State Govt. and UT |
Tender Id | 2025_TDB_744505_1 |
Reference Number |
SDP/EE/ET-201/24-25 |
Tender Fee | 2950 |
EMD | 50000 |
Tender Value | |
Place | Pamba |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1200192 |
Start Date | March 01, 2025 17:30 |
End Date |
07/03/2025 ( Expired 67 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreRehabilitation and up.gradation of guhagar chiplun helwak road from existing km 26.890 to 403.610, design km 26.230 to 403.000 nh 166 e length 13.77 km two lanes with paved shoulders configuration in the state of maharashtra on engineering, procureme
Rehabilitation and up.gradation of guhagar chiplun helwak road from existing km 26.890 to 403.610, design km 26.230 to 403.000 nh 166 e length 13.77 km two lanes with paved shoulders configuration in the state of maharashtra on engineering, procureme
Read moreSupply of straw-grass (vaikkol) for the gosalas in kallimandayam and anbu illam under the control of arulmigu dandayuthapani swami temple, palani for the year fasali 1435 (from the date of order to 30.06.2026).
Supply of straw-grass (vaikkol) for the gosalas in kallimandayam and anbu illam under the control of arulmigu dandayuthapani swami temple, palani for the year fasali 1435 (from the date of order to 30.06.2026).
Read moreSupply of pooja ingrents (for golden chariot / kattalai / sales) to the devotees in arulmigu dandayuthapani swami temple, palani for the year fasali 1435 (from the date of order to 30.06.2026).
Supply of pooja ingrents (for golden chariot / kattalai / sales) to the devotees in arulmigu dandayuthapani swami temple, palani for the year fasali 1435 (from the date of order to 30.06.2026).
Read moreSupply of 1/2kg capacity ever-silver vessel with lid and spoon size as per in the tender conditions having 304 food grade quality for arulmigu dandayuthapani swami temple, palani for the year fasali 1435 (from the date of order to 30.06.2026).
Supply of 1/2kg capacity ever-silver vessel with lid and spoon size as per in the tender conditions having 304 food grade quality for arulmigu dandayuthapani swami temple, palani for the year fasali 1435 (from the date of order to 30.06.2026).
Read moreWbpwd/pw(r)/sepd/piu-i/nit-06 of 2025-2026,sl-1
Dhulagarh -jujursah- ekabbarpur road, from 0.00 kmp to 9.00 kmp, widening and strengthening work under howrah highway division in the district of howrah under ridf -xxx.(2nd call)
Read moreAAAAAAAAAA
Login to viewNirol - khatundidanga road from 0.00 kmp to 3.200 kmp odr, widening and strengthening work under burdwan north highway division in the district of purba bardhaman.
Read moreRehabilitation upgradation to four lane road with paved shoulders length in buldhana city from km.52.450 to km. 54.470 (total length 2.02 km) and reconstruction of mnb at ch 80.170 ch 89.610 ch 93.310 ch 96.750 of buldhana khamgaon section (ch 52.450
Rehabilitation upgradation to four lane road with paved shoulders length in buldhana city from km.52.450 to km. 54.470 (total length 2.02 km) and reconstruction of mnb at ch 80.170 ch 89.610 ch 93.310 ch 96.750 of buldhana khamgaon section (ch 52.450
Read moreRfp for the rehabilitation and upgradation of pratapgarh - sultanpur road section of nh-330, from design chainage km 53.00 to km 96.417 to four lane with paved shoulder divided carriageway flexible pavement in the state of uttar pradesh on epc mode.
Rfp for the rehabilitation and upgradation of pratapgarh - sultanpur road section of nh-330, from design chainage km 53.00 to km 96.417 to four lane with paved shoulder divided carriageway flexible pavement in the state of uttar pradesh on epc mode.
Read moreWbpwd/pw(r)/sepd/piu-i/nit-05 of 2025-2026,sl-1
Bishnupur-beliaghata road from 2.80 kmp to 15.20 kmp widening and strengthening work including 3 no. bridges under barasat highway division no i in the district of north 24 parganas.
Read moreof your Industry type