Tender Details
Particulars | Details |
---|---|
Title |
To Carry Out Technical Feasibility Study For Upgrading Existing 15 T Cranes To 20 T On Two Suez Tankers, Desh Shakti And Desh Shanti
|
Description |
To Carry Out Technical Feasibility Study For Upgrading Existing 15 T Cranes To 20 T On Two Suez Tankers, Desh Shakti And Desh Shanti
|
Organisation | Shipping Corporation of India Ltd | Central Govt. Ministry/Department |
Tender Id | 2024_SCIL_750819_1 |
Reference Number |
SUEZMAX CRANES UPGRADATION |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | As per tender document |
Link | https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1054082 |
Start Date | March 19, 2024 00:05 |
End Date |
21/03/2024 ( Expired 425 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Cs for preparation of dpr for tech assessment and improvement measures on existing 6 lane udaipur ratanpur shamlaji section km 287.400 to km 401.200 of nh8 and and preparation of dpr for con of new udaipur bypass in rajasthan and gujarat
Cs for preparation of dpr for tech assessment and improvement measures on existing 6 lane udaipur ratanpur shamlaji section km 287.400 to km 401.200 of nh8 and and preparation of dpr for con of new udaipur bypass in rajasthan and gujarat
Read moreRehabilitation and up.gradation of guhagar chiplun helwak road from existing km 26.890 to 403.610, design km 26.230 to 403.000 nh 166 e length 13.77 km two lanes with paved shoulders configuration in the state of maharashtra on engineering, procureme
Rehabilitation and up.gradation of guhagar chiplun helwak road from existing km 26.890 to 403.610, design km 26.230 to 403.000 nh 166 e length 13.77 km two lanes with paved shoulders configuration in the state of maharashtra on engineering, procureme
Read moreConsultancy services for preparation of detailed project report and feasibility study for construction of 4 lane in section kohmara to ghoti km 0.000 to km 28.00 forest section in kohmara- goregaon- gondia- tirora- masnar road nh 753 length 28.00 km
Consultancy services for preparation of detailed project report and feasibility study for construction of 4 lane in section kohmara to ghoti km 0.000 to km 28.00 forest section in kohmara- goregaon- gondia- tirora- masnar road nh 753 length 28.00 km
Read moreAnnual contract for providing manpower to carry out mechanical maintenance works in different sections and for carrying out chemical and physical analysis in process control lab, all at pellet plant unit, kiocl limited, panambur, mangaluru.
Annual contract for providing manpower to carry out mechanical maintenance works in different sections and for carrying out chemical and physical analysis in process control lab, all at pellet plant unit, kiocl limited, panambur, mangaluru.
Read moreConstruction of rcc drain from km 642.800 to km 643.100 lhs along islampura area in navapur town and construction of rcc drain and box culvert in between pier p-2 and p-3 of rob at km 630.832 for existing nallah on item rate percentage basis.
Construction of rcc drain from km 642.800 to km 643.100 lhs along islampura area in navapur town and construction of rcc drain and box culvert in between pier p-2 and p-3 of rob at km 630.832 for existing nallah on item rate percentage basis.
Read moreConstruction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Construction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Read moreConsultancy services for preparation of feasibility study for development of multi modal logistic park and detailed project reports for external trunk connectivity infrastructure to the multi modal logistic park site at visakhapatnam
Consultancy services for preparation of feasibility study for development of multi modal logistic park and detailed project reports for external trunk connectivity infrastructure to the multi modal logistic park site at visakhapatnam
Read moreWork of prion measures for seepages in tunnel, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 new nh-66 to four lanes with paved shoulder from existing km. 148.000 to 161.600 including
Work of prion measures for seepages in tunnel, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 new nh-66 to four lanes with paved shoulder from existing km. 148.000 to 161.600 including
Read moreRfp for the work of improvement and up-gradation to two lane with paved shoulder configuration from existing km.7.410 to km. 56.245(design chainage km 0.000 to km.49.235) hadia chauraha to karmaini ghat section of nh-328 in the state of uttar pradesh
Rfp for the work of improvement and up-gradation to two lane with paved shoulder configuration from existing km.7.410 to km. 56.245(design chainage km 0.000 to km.49.235) hadia chauraha to karmaini ghat section of nh-328 in the state of uttar pradesh
Read moreConsultancy services to carry out drone survey and video analysis with various latest technological tools including artificial intelligence and machine learning to provide deliverables including status and reports for the national highway stretches
Consultancy services to carry out drone survey and video analysis with various latest technological tools including artificial intelligence and machine learning to provide deliverables including status and reports for the national highway stretches
Read moreof your Industry type