Tender Details
Particulars | Details |
---|---|
Title |
Fixing Of Cutting Bits And Cutting Bit Holders On Primary Crusher Roll Assembly Of Departmental Semi Mobile Crusher (1000 Tph) Of Mini Chp At Dipka Expansion Project.
|
Description |
Fixing Of Cutting Bits And Cutting Bit Holders On Primary Crusher Roll Assembly Of Departmental Semi Mobile Crusher (1000 Tph) Of Mini Chp At Dipka Expansion Project.
|
Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_SECL_304722_1 |
Reference Number |
SECL/GM/DA/SO(EnM)/ e-tender/23-24/63 dtd-11/03/24 |
Tender Fee | 0 |
EMD | 11700 |
Tender Value | |
Place | Dipka Expansion Project, Dipka Area |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=315702 |
Start Date | March 13, 2024 15:30 |
End Date |
25/03/2024 ( Expired 425 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Erection of different size of steel tubular poles at different locations for installation of cctv at various weigh bridges, boom barriers and coal stocks on as and when required basis under dipka expansion project.
Erection of different size of steel tubular poles at different locations for installation of cctv at various weigh bridges, boom barriers and coal stocks on as and when required basis under dipka expansion project.
Read moreRepairing/rewinding of 02 no. 150 kw, squirrel cage induction motor with volt 3.3 kv make toshiba rpm 1440 sr.no. 30048860m and sr.no. 30048861m installed at 2104 secondary and 2101 primary crusher under chp/cpp,ppr.
Repairing/rewinding of 02 no. 150 kw, squirrel cage induction motor with volt 3.3 kv make toshiba rpm 1440 sr.no. 30048860m and sr.no. 30048861m installed at 2104 secondary and 2101 primary crusher under chp/cpp,ppr.
Read moreDemounting, dismantling, repairing of input shaft, rebuilding and line boring of 1st and 2nd mount bearing seats, pressing of bearings, reassembling, fitment and testing of complete gear box assembly of primary crusher 2101 under chp/cpp, piparwar ar
Demounting, dismantling, repairing of input shaft, rebuilding and line boring of 1st and 2nd mount bearing seats, pressing of bearings, reassembling, fitment and testing of complete gear box assembly of primary crusher 2101 under chp/cpp, piparwar ar
Read moreRepairing of cutting edge and end bit portion, repairing of broken brace arm and brace screw and cleaning of radiator assembly of dozer sl. no. 11999 model bd355 dozer at adic kusunda area
Repairing of cutting edge and end bit portion, repairing of broken brace arm and brace screw and cleaning of radiator assembly of dozer sl. no. 11999 model bd355 dozer at adic kusunda area
Read moreProviding and fixing of new expansion tank in place of old expansion tank on chiller line of ac plant at block-a and civil works for foundation of tank and other required allied work at various site in gmch sector-32, chandigarh
Providing and fixing of new expansion tank in place of old expansion tank on chiller line of ac plant at block-a and civil works for foundation of tank and other required allied work at various site in gmch sector-32, chandigarh
Read moreOverhauling/part changing/servicing/maintenance and repair of primary gyratory crusher no. 1, no. 2 and old crusher (pgc-1500h) installed at amlohri chp.
Overhauling/part changing/servicing/maintenance and repair of primary gyratory crusher no. 1, no. 2 and old crusher (pgc-1500h) installed at amlohri chp.
Read moreOutsourcing of repair, refurbishment of 2 nos roll assemblies (1 set) of primary sizer working at jvr epc chp, sathupally, kgm area on nomination basis to ms aphmel
Outsourcing of repair/refurbishment of 2 nos roll assemblies (1 set) of primary sizer working at jvr epc chp, sathupally, kgm area on nomination basis to m/s aphmel
Read moreDeployment of pc-210 (2 nos) with tipper (2 nos) for cleaning/removal of accumulated slush / muck on the side of berms and laying of hume pipe including excavation as and when required during monsoon at dipka expansion project of dipka area
Deployment of pc-210 (2 nos) with tipper (2
 nos) for cleaning/removal of accumulated slush / muck on the side
 of berms and laying of hume pipe including excavation as and when
 required during monsoon at dipka expansion project of dipka
 area
Read moreProviding and fixing of micro-processor based zero/under-speed switches along with all the allied works including incorporation of these switches in the plc arrangement of conveyors of new chp and silo of secl, dipka expansion project
Providing and fixing of micro-processor based zero/under-speed switches along with all the allied works including incorporation of these switches in the plc arrangement of conveyors of new chp and silo of secl, dipka expansion project
Read moreRepairing of discharge pulley, size 1600mm x 630mm suitable for 1400mm size stacker conveyor of departmental semi-mobile crusher at dipka expansion project.
Repairing of discharge pulley, size 1600mm x 630mm suitable for 1400mm size stacker conveyor of departmental semi-mobile crusher at dipka expansion project.
Read moreof your Industry type