Tender Details

Particulars Details
Title
For The Work Of Repair Of Head Regulator Gate Of Seoni Distributary Canal R.D. 0.00 Km To 13.50 Km. Of Left Bank Canal Of R.A.B.L.S Project.
Description
For The Work Of Repair Of Head Regulator Gate Of Seoni Distributary Canal R.D. 0.00 Km To 13.50 Km. Of Left Bank Canal Of R.A.B.L.S Project.
Organisation Narmada Valley Development Authority | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 1295
EMD 2433
Tender Value
Place BARGI NAGAR
Link

AAAAAAAAAA

Login to view
Start Date May 02, 2025 23:00
End Date

21/05/2025 ( 15 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Consultancy services for authoritys engineer for supervision of work of upgradation of existing intermediate lane flexible pavement to 2l with ps from km 0.00 to km 75.00 on orchha tikamgarh shahgarh nh 539 in the state of madhya pradesh on epc mode

Consultancy services for authoritys engineer for supervision of work of upgradation of existing intermediate lane flexible pavement to 2l with ps from km 0.00 to km 75.00 on orchha tikamgarh shahgarh nh 539 in the state of madhya pradesh on epc mode.

Read more
Appointment of issuing bank for a letter of credit

Invitation to act as issuing bank for an aggregate/portfolio letter of credit (lc) to cover three sub-projects, such lc backstopped by a guarantee from the international bank for reconstruction and development (ibrd) to support the sngrbp

Read more
Construction of distribution system for 4924.04 ha. of cca including command area development (cad) of salandi left main canal from rd 49.810 km to 59.970 km through under ground pipe line irrigation system (gravity flow) of anandapur barrage project

Construction of distribution system&amp#x0d for 4924.04 ha. of cca including&amp#x0d command area development (cad)&amp#x0d of salandi left main canal from rd&amp#x0d 49.810 km to 59.970 km through&amp#x0d under ground pipe line irrigation&amp#x0d system (gravity flow) of abp

Read more
Irqp work of bus stand to police line via housing colony road (length- 1.10 km) , housing colony road (length 2.80 km) and dhanbad link road (length 1.50 km) total length 5.40 km under plan head for the year 2025-26.

Irqp work of bus stand to police line via housing colony road (length- 1.10 km) , housing colony road (length 2.80 km) and dhanbad link road (length 1.50 km) total length 5.40 km under plan head for the year 2025-26.

Read more
For the work of repair of head and cross regulator gate of sadumar branch canal r.d. 0.00 km to 20.910 km. of left bank canal of r.a.b.l.s project

For the work of repair of head and cross regulator gate of sadumar branch canal r.d. 0.00 km to 20.910 km. of left bank canal of r.a.b.l.s project

Read more
For the work of repair of head regulator gate of seoni distributary canal r.d. 0.00 km to 13.50 km. of left bank canal of r.a.b.l.s project.

For the work of repair of head regulator gate of seoni distributary canal r.d. 0.00 km to 13.50 km. of left bank canal of r.a.b.l.s project.

Read more
Emergency mtc. of left bank canal of kmip .. flood monsoon season / sh_- urgent repair of left bank main canal (l_17.594 km) _ branch canals(l_6.67 km) by providing palasiding, gunny bags, wire crates..mixed class bats, de-silting, earth filling etc.

Emergency mtc. of left bank canal of kmip .. flood monsoon season / sh_- urgent repair of left bank main canal (l_17.594 km) _ branch canals(l_6.67 km) by providing palasiding, gunny bags, wire crates..mixed class bats, de-silting, earth filling etc.

Read more
Construction of distribution system for 12155.80 ha. of cca including command area development (cad) of salandi left main canal from rd 45.570 km to 49.810 km through under ground pipe line irrigation system (gravity flow) of anandapur barrage projec

Construction of distribution system for 12155.80 ha. of cca including command area development (cad) of salandi left main canal from rd 45.570 km to 49.810 km through under ground pipe line irrigation system (gravity flow) of anandapur barrage projec

Read more
For removal of deposited earth in main canal ch. 348 to 358 and ch. 630 to 650 and left side bank raising repair work

For removal of deposited earth in main canal ch. 348 to 358 and ch. 630 to 650 and left side bank raising repair work

Read more
Supply of site supervisors (semi-skilled) preferably iti or experienced for supervision of worksites of salandi left main canal (slmc) from rd 30.547 km to 45.570 km and from rd 49.810 km to 59.970 km under markona canal division, markona for the per

Supply of site supervisors (semi-skilled) preferably iti or experienced for supervision of worksites of salandi left main canal (slmc) from rd 30.547 km to 45.570 km and from rd 49.810 km to 59.970 km under markona canal division, markona for the per

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise