Tender Details

Particulars Details
Title
Bichpari, Barwala, Construction Of Bc Chaupal (Vangy)
Description
Bichpari, Barwala, Construction Of Bc Chaupal (Vangy)
Organisation Haryana Government | State Govt. and UT
Tender Id 2025_HRY_445325_1
Reference
Number
2025C2E5A74F 9E5F 4F59 9C39 640AC6781CF5699DEV
Tender Fee 2180
EMD 29402
Tender Value
Place BICHPARI
Link
View Original Tender Notice

https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=522761

Start Date May 08, 2025 16:45
End Date
Expired 20/05/2025

Expired 430 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Development of ujjain airport, ujjain madhya pradesh. sh detailed designing engineering, procurement and construction of new domestic terminal building and allied works

Development of ujjain airport, ujjain, madhya pradesh. sh detailed designing, engineering, procurement and construction of new domestic terminal building and allied works

Read more
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Read more
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).

Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).

Read more
Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam

Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam

Read more
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Read more
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp

Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp

Read more
Bichpari, barwala, construction of dhanak chaupal (vangy)

Bichpari, barwala, construction of dhanak chaupal (vangy)

Read more
Bichpari, barwala, construction of chamar chaupal (vangy)

Bichpari, barwala, construction of chamar chaupal (vangy)

Read more
Bichpari, barwala, construction of banjara chaupal (vangy)

Bichpari, barwala, construction of banjara chaupal (vangy)

Read more
Dhiktana, barwala, construction of bc chaupal (vangy)

Dhiktana, barwala, construction of bc chaupal (vangy)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise