Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Gasket For Tm 4303 Of 1400 Hp Demu/Dpc
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 106461139 |
|
Reference Number |
56245840 |
| Tender Fee | 0 |
| EMD | 4310 |
| Tender Value | - |
| Place | New Delhi |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/supply/pdfdocs/102024/106461139/viewNitPdf_4705785.pdf |
| Start Date | September 05, 2024 23:10 |
| End Date |
Expired
08/10/2024
Expired 736 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Mtps i tm i replacement of failed stem in the released hp ip control valves and esvs with new stems
Mtps i tm i replacement of failed stem in the released hp ip control valves and esvs with new stems
Read moreMtps i tm unit ii complete overhauling of hp bypass and lp bypass spray valves and oil supply unit during aoh 2026 2027
Mtps i tm unit ii complete overhauling of hp bypass and lp bypass spray valves and oil supply unit during aoh 2026 2027
Read moreMtps i tm unit ii overhauling and flange gasket renewing of valves in heater drain pegging steam to deaerator condenser air auxiliary steam and drain water lines and gasket renewing of valves in unit ii during aoh 2026 27
Mtps i tm unit ii overhauling and flange gasket renewing of valves in heater drain pegging steam to deaerator condenser air auxiliary steam and drain water lines and gasket renewing of valves in unit ii during aoh 2026 27
Read moreMtpsi tm unit ii annual overhauling and gasket renewing of valves in feed water main condensate and extraction steam lines in unit ii during annual overhauling 2026 27
Mtpsi tm unit ii annual overhauling and gasket renewing of valves in feed water main condensate and extraction steam lines in unit ii during annual overhauling 2026 27
Read moreProcurement of different types of gland packing bonnet seal and spiral wound gasket of hp valves to be utilized during unit 4 oh
Procurement of different types of gland packing bonnet seal and spiral wound gasket of hp valves to be utilized during unit 4 oh
Read moreProcurement of different types of gland packing bonnet seal and spiral wound gasket of hp valves to be utilized during unit 4 oh
Procurement of different types of gland packing bonnet seal and spiral wound gasket of hp valves to be utilized during unit 4 oh
Read moreMtps i tm unit ii renewal of gasket at water box side tube nest side condensate inlet and outlet flange inspection and cleaning of tube nest and hydraulic testing of lph 2 3 4 gc 1 ejector 2a vent condenser and renewal of gasket at deaerator main
Mtps i tm unit ii renewal of gasket at water box side tube nest side condensate inlet and outlet flange inspection and cleaning of tube nest and hydraulic testing of lph 2 3 4 gc 1 ejector 2a vent condenser and renewal of gasket at deaerator main
Read moreMtps i tm unit ii overhauling of hp lp by pass valve actuator and its spray valve actuators including servicing of oil filters during the aoh of 2026 27
Mtps i tm unit ii overhauling of hp lp by pass valve actuator and its spray valve actuators including servicing of oil filters during the aoh of 2026 27
Read moreTtps mech ii tm i unit iii inspection overhauling rectification of condenser steam side longitudinal bellows hp lp bypass valves and oil system steam and condensate valves for main turbine system during the forthcoming annual overhaul
Ttps mech ii tm i unit iii inspection overhauling rectification of condenser steam side longitudinal bellows hp lp bypass valves and oil system steam and condensate valves for main turbine system during the forthcoming annual overhaul
Read moreMtps i tm i removal and re insulation of hp ip control valves gland steam pipes esv iv and hpt ipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2026 27 as and when required
Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esv iv and hpt ipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2026 27 as and when required
Read moreof your Industry type