Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of 56 Nos. Security Morchas &Amp 15 Nos. Guard Rooms In Jat (Excl.) Ptkc Section As Per Phase 1 In Connection With Multi Disciplinary Committee Report.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 73144835 |
Reference Number |
378-2023-24-JAT-DRM-FZR |
Tender Fee | 0 |
EMD | 3.55 Lakh |
Tender Value | |
Place | New Delhi |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/022024/73144835/viewNitPdf_4456712.pdf |
Start Date | January 17, 2024 18:51 |
End Date |
08/02/2024 ( Expired 508 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of 2 two nos fire stair and internal modification as per fire safety recommendation at academic building of north bengal dental college and hospital sushrutnagar in the district of darjeeling
Construction of 2 two nos fire stair and internal modification as per fire safety recommendation at&#x0d academic building of north bengal dental college and hospital sushrutnagar in the district of darjeeling
Read moreConstruction of 30 nos. csc in convergence with sbmg in various places as per annexure a under bhagwangola-i panchayat samity
Construction of 30 nos. csc in convergence with sbmg in various places as per annexure a under bhagwangola-i panchayat samity
Read moreConstruction of rtwhs and rtwhs with recharge shafat (03 nos.) in mjsa 2.0 phase-ii in block-pilani
Construction of &#x0d rtwhs and rtwhs with recharge shafat (03 nos.) in mjsa 2.0 phase-ii &#x0d
Read moreProviding installation testing commissioning of 02 two nos electric traction type passenger elevators 13 thirteen passenger ie 884 kg capacity with 1 one year warranty and camc in g4 building under construction at tripura high court agartala
Providing installation testing commissioning of 02 two nos electric traction type passenger elevators 13 thirteen passenger ie 884 kg capacity with 1 one year warranty and camc in g4 building under construction at tripura high court agartala&#x0d &#x0d &#x0d
Read moreConstruction of 2 nos rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at rail par zone-36 asansol under amrut 2.0 phase-iii within amc
Construction of 2 nos rcc ohr along with land development approach road guard room and boundary&#x0d wall ....... in all respect of proposed water supply scheme at rail par zone-36 asansol under amrut 2.0&#x0d phase-iii within amc
Read moreConstruction of rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at kalajharia zone-32 asansol under amrut 2.0 phase-iii within amc
Construction of rcc ohr along with land development approach road guard room and boundary wall&#x0d ....... in all respect of proposed water supply scheme at kalajharia zone-32 asansol under amrut 2.0&#x0d phase-iii within amc
Read moreE.l.d.c.no.smii/p10/1716/2025 procurement of 7080 nos of 48 w led 2309 nos of 120 w led 546 nos of 150 w led street light fittings with two years warranty under buy back scheme for use in the south region zones 11 to 15 of gcc phase i
E.l.d.c.no.smii/p10/1716/2025 &#x0d procurement of 7080 nos of 48 w led 2309 nos of 120 w led 546 nos of 150 w led street light fittings with two years warranty under buy back scheme for use in the south region zones 11 to 15 of gcc phase i&#x0d &#x0d
Read moreSupply and application of insulation materials on pipe, equipment for part a and part b as per standard specification by providing all required materials in connection with the composite work for setting upof hpg-2, butene-1 and psa units atlepetkata
Supply and application of insulation materials on pipe, equipment for part a and part b as per standard specification by providing all required materials in connection with the composite work for setting upof hpg-2, butene-1 and psa units atlepetkata
Read moreGeneral-rm-2025-26- rc 2- phase 1- cluster ii- zone 10- one year running contract for various pwd roads under road section malappuram in malappuram district- 6 nos of roads stretches for a length of 19.295 km
General-rm-2025-26- rc 2- phase 1-&#x0d cluster ii- zone 10- one year running&#x0d contract for various pwd roads under road&#x0d section malappuram in malappuram district- 6&#x0d nos of roads stretches for a length of 19.295&#x0d km
Read moreCarrying out various instrumentation works for part b as per standard specification by providing all required materials in connection with the composite works for setting up of hpg-2, butene-1 and psa units at lepetkata, assam of m/s bcpl
Carrying out various instrumentation works for part b as per standard specification by providing all required materials in connection with the composite works for setting up of hpg-2, butene-1 and psa units at lepetkata, assam of m/s bcpl
Read moreof your Industry type