Tender Details

Particulars Details
Title
Construction Of Wind Break Of 10 M Height Along The Coal Stock Yard Covering A Length Of 450 M At Gayatri Ug Mine For Compliance Of Ec And Cte/Cto Conditions.
Description
Construction Of Wind Break Of 10 M Height Along The Coal Stock Yard Covering A Length Of 450 M At Gayatri Ug Mine For Compliance Of Ec And Cte/Cto Conditions.
Organisation South Eastern Coalfields Limited | Public Sector Undertakings
Tender Id 2025_SECL_337399_1
Reference
Number
GM/BSPR/Civil/e-tender/ 2025-26/09Dt.12.06.2025
Tender Fee 0
EMD 1.01 Lakh
Tender Value -
Place RGK Sub Area
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=349758

Start Date June 14, 2025 15:30
End Date
Expired 28/06/2025

Expired 472 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Arrangement for mist / fixed water sprinkling at weighbridge of e. j. area for compliance of ec and cto conditions.

Arrangement for mist / fixed water sprinkling at weighbridge of e. j. area for compliance of ec and cto conditions.

Read more
Construction of cement concrete road with toe wall and side drain around the coal stock yard at gayatri ug mine for compliance of ec and cte/cto condition of rgk sub area at bishrampur area.

Construction of cement concrete road with toe wall and side drain around the coal stock yard at gayatri ug mine for compliance of ec and cte/cto condition of rgk sub area at bishrampur area.

Read more
Hiring of consultancy services for obtaining environment clearance(ec) and cte and cto for residential colony of unit 1 to 4 (4x250mw) of chhabra thermal power plant

Hiring of consultancy services for obtaining environment clearance(ec) and cte and&amp#x0d cto for residential colony of unit 1 to 4 (4x250mw) of chhabra thermal power&amp#x0d plant

Read more
Arrangement/digging of temporary settling pond near quarry 1 extension as per the compliance of ec conditions of rajhara ocp, rajhara area.

Arrangement/digging of temporary settling pond near quarry 1 extension as per the compliance of ec conditions of rajhara ocp, rajhara area.

Read more
Lining up of agency for supply, installation and commissioning of ceqms and flow meter at the outlet of existing stp of township in compliance to cto conditions

Lining up of agency for supply, installation and commissioning of ceqms and flow meter at the outlet of existing stp of township in compliance to cto conditions

Read more
Up-gradation of etp, stp and collection of hazardous waste of nmug to oc mine for compliance of conditions under cto at new majri sub area of majri area.

Up-gradation of etp, stp and collection of hazardous waste of nmug to oc mine for compliance of conditions under cto at new majri sub area of majri area.

Read more
Rfp for selection of consultant for eia,cte,cto and preparation of 6 monthly environment compliance report including submission to various depts. and other concerning authorities for town development schemes namely scheme no. 64 and scheme no. 65 ja

Rfp for selection of consultant for eia,cte,cto and preparation of 6 monthly environment compliance report including submission to various depts. and other concerning authorities for town development schemes namely scheme no. 64 and scheme no. 65 ja

Read more
Rfp for selection of consultant for eia,cte,cto and preparation of 6 monthly environment compliance report including submission to various depts. and other concerning authorities for town development schemes namely tds 2, tds 3 and tds 5 jabalpur

Rfp for selection of consultant for eia,cte,cto and preparation of 6 monthly environment compliance report including submission to various depts. and other concerning authorities for town development schemes namely tds 2, tds 3 and tds 5 jabalpur

Read more
Consultancy services for obtaining consent to operate (cto), preparation and submission of half yearly environment clearance (ec) compliance report for multi modal logistic park (mmlp) at jalna in the state of maharashtra

Consultancy services for obtaining consent to operate (cto), preparation and submission of half yearly environment clearance (ec) compliance report for multi modal logistic park (mmlp) at jalna in the state of maharashtra

Read more
Construction of wind barrier with side sheeting to control the dust at kchp railway siding as per ec conditions of pkoc in manuguru area, bhadradri kothagudem district, telangana state.

Construction of wind barrier with side sheeting to control the dust at kchp railway siding as per ec conditions of pkoc in manuguru area, bhadradri kothagudem district, telangana.

Read more
Click Here to Download Dockets