Tender Details

Particulars Details
Title
Battery Box Assly For 3 Phase Locomotives As Per Clw Specn No Clw/Ms/3/037 Alt 10 Or Latest And Clw Drg No 1209 06.138 001 (Alt 8 Or Latest) And 1209 06.138 003 (Alt 3 Or Latest) With Modified Hanger For Battery Box As Per Rdso Drg No Skel 4666 Or Latest. Note: Latest Alteration/ Specification Will Be Applicable At The Time Tender Closing.
Description
Battery Box Assly For 3 Phase Locomotives As Per Clw Specn No Clw/Ms/3/037 Alt 10 Or Latest And Clw Drg No 1209 06.138 001 (Alt 8 Or Latest) And 1209 06.138 003 (Alt 3 Or Latest) With Modified Hanger For Battery Box As Per Rdso Drg No Skel 4666 Or Latest. Note: Latest Alteration/ Specification Will Be Applicable At The Time Tender Closing.
Organisation Ministry of Railways
Tender Id Login to view
Reference
Number
Login to view
Tender Fee -
EMD -
Tender Value -
Place
Link Login to view
Start Date October 06, 2026 16:00
End Date
Open 09/11/2026

25 days left

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Primary spring inner (middle axle) drg.no./ spec.:- clw specn.no. clw/ms/3/008 alt.3 with latest, clw drg. no. 1209-01- 115-009 alt-1 with latest

Primary spring inner (middle axle) drg.no./ spec.:- clw specn.no. clw/ms/3/008 alt.3 with latest, clw drg. no. 1209-01- 115-009 alt-1 with latest

Read more
Necked down bolt m20 x 135 as per abb drg. no. ia016-00271 rev-3 or latest, clw spec./drg. no.1209-01.315-006 alt-1 or latest

Necked down bolt m20 x 135 as per abb drg. no. ia016-00271 rev-3 or latest, clw spec./drg. no.1209-01.315-006 alt-1 or latest

Read more
Wiper motor complete assly [rh side] for 3-phase loco as per clw specification no. clw/ms/3/050 alt-6 or latest and drg. no. 1209-07-303-019 alt-1 or latest

Wiper motor complete assly [rh side] for 3-phase loco as per clw specification no. clw/ms/3/050 alt-6 or latest and drg. no. 1209-07-303-019 alt-1 or latest

Read more
Hose flexible for tm135 ventilation of 3-phase locos as per clw drg. no. 1209-11.339-037 alt - 1 or latest if any.

Hose flexible for tm135 ventilation of 3-phase locos as per clw drg. no. 1209-11.339-037 alt - 1 or latest if any.

Read more
Axle box complete without bearings as per [axle box complete without bearings as per clw drg. no.1209.01.111.005 alt-3 or latest and conforming to clw spec no. clw/ms/3/003 alt-5 or latest.(as per uvam id: 2100113)]

Axle box complete without bearings as per [axle box complete without bearings as per clw drg. no.1209.01.111.005 alt-3 or latest and conforming to clw spec no. clw/ms/3/003 alt-5 or latest.(as per uvam id: 2100113)]

Read more
Set of hardware for gear case consisting of 09 items in 648 items in set as per clw s drg. no. 1209-01.111-004 ( alt.- 05 or latest ) ( ref.- 3 of clw s drg. no. 1209-01.111-001 or latest ) ( details of items as per annexure enclosed ).

Set of hardware for gear case consisting of 09 items in 648 items in set as per clw s drg. no. 1209-01.111-004 ( alt.- 05 or latest ) ( ref.- 3 of clw s drg. no. 1209-01.111-001 or latest ) ( details of items as per annexure enclosed ).

Read more
Lock of bur box, fb & hb (green lock with key). clw drg. no.- clw/es/3/sk-6/0049 alt. f with latest alteration.

Lock of bur box, fb & hb (green lock with key). clw drg. no.- clw/es/3/sk-6/0049 alt. f with latest alteration.

Read more
Set of 04 items required to elbow connector as per clw drg. no. 1209-18.406-035, sl. no. 1, alt. 2 or latest if any.

Set of 04 items required to elbow connector as per clw drg. no. 1209-18.406-035, sl. no. 1, alt. 2 or latest if any.

Read more
Hose connection for oil cooler ventilation as per clw drg.no.1209-11.344-052 alt.1. or latest if any.

Hose connection for oil cooler ventilation as per clw drg.no.1209-11.344-052 alt.1. or latest if any.

Read more
Terminal box cover as per clw drawing no.4twd.096.027 alt 3 or latest.

Terminal box cover as per clw drawing no.4twd.096.027 alt 3 or latest.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise