Tender Details
Particulars | Details |
---|---|
Title |
Wbmad/Ulb/Rsm/123/24 25
|
Description |
Construction Of Blacktop Road From Behind Rajpur Burning Ghat To Dwarir Road Via Govt. Colony School And Balir Math In Ward No. 25 Under Rajpur Sonarpur Municipality.
|
Organisation | MUNICIPAL AFFAIRS DEPARTMENT | State Govt. and UT |
Tender Id | 2024_MAD_717897_1 |
Reference Number |
WBMAD/ULB/RSM/123/24-25 |
Tender Fee | 0 |
EMD | 18466 |
Tender Value | |
Place | RAJPUR SONARPUR MUNICIPALITY |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1578856 |
Start Date | July 20, 2024 16:30 |
End Date |
29/07/2024 ( Expired 289 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreConstruction of flood protection wall from rafeal cardoz house to salvador fernandes house at zorichembhat in ward no.7 of v.p. carambolim in cumbharjua constituency
Construction of flood protection wall from rafeal cardoz house to salvador fernandes house at zorichembhat in ward no.7 of v.p. carambolim in cumbharjua constituency
Read moreWidening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Read moreChambal alwar bharatpur water supply project package 2 based on hybrid annuity model ace(p) bharatpur nit no. 05 / 2024-25
Work of construction of intermediate cwph at kotra baseri laying of clear water transmission main from kotra to naroli nadbai via junction 2 at naroli ips nadbai nagar ramgarh kishangarhbas tijara jairoli and bhiwadi based on ham model under jjm
Read moreConstruction of 2 lane service road from km. 1072.900 (umedganj canal) to km. 1079.400 (naya nohara under pass) section of nh 27 (kota bypass) in the state of rajasthan
Construction of 2 lane service road from km. 1072.900 (umedganj canal) to km. 1079.400 (naya nohara under pass) section of nh 27 (kota bypass) in the state of rajasthan
Read moreIn ward 57 meera vihar, drain and c.c. road construction work from ravi to sujan, guddi to bengali babu, rajender to bantu, jhabbi to guddu, sujan singh to pandit ji, rakesh wali gali, from temple to rakesh, from suraj to jabbi.
In ward 57 meera vihar, drain and c.c. road construction work from ravi to sujan, guddi to bengali babu, rajender to bantu, jhabbi to guddu, sujan singh to pandit ji, rakesh wali gali, from temple to rakesh, from suraj to jabbi.
Read moreConstruction of rcc drain from mirgauti main road to sunil bansal house at ward no. 08
Construction of rcc drain from mirgauti main road to sunil bansal house at ward no. 08
Read moreConstruction of cc road from shailendra rajpoot to asgar bhaijan and mulli basor to damoh panna road in gourishankar ward
Construction of cc road from shailendra rajpoot to asgar bhaijan and mulli basor to damoh panna road in gourishankar ward
Read moreConstruction of cc road at ward no 15 lalwani colony keshav goswami to panday ji house municipal council narmadapuram mp.
Construction of cc road at ward no 15 lalwani colony keshav goswami to panday ji house municipal council narmadapuram mp.
Read moreConstruction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreof your Industry type