Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Plug,Socket,Plug Moulded,Plug And Socket 5 A,Socket Plug Base,Switch Board,Switch Board,Board Switch
|
| Description |
|
| Organisation | Steel Authority of India Limited | Ministry of Steel |
| Tender Id | GEM/2023/B/3889303 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://gem.gov.in/ |
| Start Date | August 29, 2023 20:59 |
| End Date |
Expired
08/09/2023
Expired 1129 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
E-auction for settlement of sand ghats vaishali(ganga 5a)
E-auction for settlement of sand ghats vaishali(ganga 5a)
Read moreProcurement of network power switch for ups system
Procurement of network power switch for ups system
Read moreSupply of strong acid cation exchange resin and strong base anion exchange resin for dm plant
Supply of strong acid cation exchange resin and strong base anion exchange resin for dm plant
Read moreProcurement of brass ball valve 20mm, 50mm, ms gi nipple-pipe 20mm, and ms gi socket-pipe 20mm for use at pump section, ocp-3, rg2
Procurement of brass ball valve 20mm, 50mm, ms gi nipple-pipe 20mm, and ms gi socket-pipe 20mm for use at pump section, ocp-3, rg2
Read more(a) erection /dismantling of poles along with conductors and other associated accessories 3.3 kv o/h line (feeder 1, feeder 2 , feeder 3 and feeder 4), and installation of 11 kv grade goab switch, installation of lighting transformer, switch shifting
(a) erection /dismantling of poles along with conductors and other associated accessories 3.3 kv o/h line (feeder 1, feeder 2 , feeder 3 and feeder 4), and installation of 11 kv grade goab switch, installation of lighting transformer, switch shifting
Read morePeriodical cleaning of mud accumulated at washing platforms and etps at base workshop and chp for the year 2026-27 at ocp-i, rg-iii area.
Periodical cleaning of mud accumulated at washing platforms and etps at base workshop and chp for the year 2026-27 at ocp-i, rg-iii area.
Read moreProcurement of paints are required for painting of sign boards,sop,curb walls ,tyre cage,bay margins etc. at different section at base workshop oc-iii, rg2
Procurement of paints are required for painting of sign boards,sop,curb walls ,tyre cage,bay margins etc. at different section at base workshop oc-iii, rg2
Read moreBtps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Btps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Read moreof your Industry type