| Particulars | Details |
|---|---|
| Title |
Dismantling And Erection And Repairing Of 440 V Over Head Line At 04 No.Sub Station To Zero Seam Colony At Akwmc,Under Katras Area.
|
| Description |
Dismantling And Erection And Repairing Of 440 V Over Head Line At 04 No.Sub Station To Zero Seam Colony At Akwmc,Under Katras Area.
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_BCCL_290137_1 |
|
Reference Number |
BCCL/KA/IV/ENM/E-TEN/23-24/322 DT.03.10.2023 |
| Tender Fee | - |
| EMD | 2000 |
| Tender Value | - |
| Place | AREA MANAGER ENM KATRAS AREA IV |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | October 03, 2023 17:30 |
| End Date |
Expired
16/10/2023
Expired 1094 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Dismantling and erection of 6.6 kv over head line 3000 gpm pump ampl north side power provide at akwmc katras area.
Dismantling and erection of 6.6 kv over head line 3000 gpm pump ampl north side power provide at akwmc katras area.
Read moreEstimate for dismantling of over head water tank.
Estimate for dismantling of over head water tank.
Read moreRepairing of 6 inch dia delivery pipe range in 2 seam incline ug fabrication of 3 nos. 6 inchu type bend one no. t type bend and 2 nos. at short pieces at 2 seam ug under wmc, akwmc katras area
Repairing of 6 inch dia delivery pipe range in 2 seam incline ug fabrication of 3 nos. 6 inchu type bend one no. t type bend and 2 nos. at short pieces at 2 seam ug under wmc, akwmc katras area
Read moreErection, maintenance and dismantling of pontoon bridge over river sharda at village ramnagar kalan, block bijua, in gola constituency, lakhimpur kheri.
Erection, maintenance and dismantling of pontoon bridge over river sharda at village ramnagar kalan, block bijua, in gola constituency, lakhimpur kheri.
Read moreErection of lt over head line (12 span) for illumination in sidhalu village under ashok ocp, piparwar area.
Erection of lt over head line (12 span) for illumination in sidhalu village under ashok ocp, piparwar area.
Read moreDesign construction of rcc over head tank at zero degree scheme no.41, jabalpur capacity 1250 kl and staging 20 meter from the road level in circular shape on column structure including providing and fixing of inlet, outlet, scour and over flow pipe
Design construction of rcc over head tank at zero degree scheme no.41, jabalpur capacity 1250 kl and staging 20 meter from the road level in circular shape on column structure including providing and fixing of inlet, outlet, scour and over flow pipe
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read more(1) dismantling and erection of over head line 6.6kv due to extension for 7 seam akwmc,ocp under katras area-iv...
(1) dismantling and erection of over head line 6.6kv due to extension for 7 seam akwmc,ocp under katras area-iv...
Read moreDismantling and erection and repairing of 440v over head line at keshalpur sub station to hahuman mandir at akwmc,under katras area...
Dismantling and erection and repairing of 440v over head line at keshalpur sub station to hahuman mandir at akwmc,under katras area...