Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Rewinding Of 1.5 Megawatt Alternator Rotor
|
| Description |
Rewinding Of 1.5 Megawatt Alternator Rotor
|
| Organisation | Government of Uttar Pradesh |
| Tender Id | 2023_TBCSM_821092_1 |
|
Reference Number |
BCSM/MP/TENDER/2023-24/843 |
| Tender Fee | 590 |
| EMD | 14000 |
| Tender Value | - |
| Place | THE BAGHPAT COOPERATIVE SUGAR MILLS LIMITED |
| Link |
View Original Tender Notice
https://etender.up.nic.in |
| Start Date | July 15, 2023 16:30 |
| End Date |
Expired
22/07/2023
Expired 1181 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Rewinding of lt motor and restacking of stator and rotor core, replacement of rotor aluminum bars of abb make 110kw, 415v dust extraction motor, pertaining to lt/em/chp for the year 2026 - 27
Rewinding of lt motor and restacking of stator and rotor core, replacement of rotor aluminum bars of abb make 110kw, 415v dust extraction motor, pertaining to lt/em/chp for the year 2026 - 27
Read moreProcurement of alternator and starting motor for bhupalpalli area -reg.
Procurement of alternator and starting motor for bhupalpalli area -reg.
Read moreDesign, engineering, manufacture, testing, inspection, packing, supply and delivery of one complete set of 150/175mw, 13.8kv generator/motor (stator and rotor) unit assembly consisting of stator including stator frame, stator core, stator bars etc., and rotor including spider, rotor rim, rotor poles and locking keys with suitable connecting accessories and other unit auxiliaries like stator air coolers with associated pipelines etc. exactly to fit in the existing pit and sole plates, and dismant
Design, engineering, manufacture, testing, inspection, packing, supply and delivery of one complete set of 150/175mw, 13.8kv generator/motor (stator and rotor) unit assembly consisting of stator including stator frame, stator core, stator bars etc., and rotor including spider, rotor rim, rotor poles and locking keys with suitable connecting accessories and other unit auxiliaries like stator air coolers with associated pipelines etc. exactly to fit in the existing pit and sole plates, and dismantling of existing unit, erection, testing and commissioning of new generator/motor unit at srisailam left bank hydro electric station (slbhes, reversible pumped storage plant), srisailam dam west, nagarkurnool dist., telangana, india.
Read moreInsitu complete rewind along with replacement of melted coil with newone of brbcl nabinagar u#2 generator rotor.
Insitu complete rewind along with replacement of melted coil with newone of brbcl nabinagar u#2 generator rotor.
Read moreRepairing and rewinding of 02 nos. of distribution transformers, 250kva, 11kv/440v and 250kva, 3.3kv/440v installed at cisf colony and gurudwara chowk under gm unit nk area.
Repairing and rewinding of 02 nos. of distribution transformers, 250kva, 11kv/440v and 250kva, 3.3kv/440v installed at cisf colony and gurudwara chowk under gm unit nk area.
Read moreRepair and maintenance of air conditioners (1.5 ton/2 ton) on amc and repairs of refrigerators and water coolers in bhupalpalli area for a period of two years. - reg.
Repair and maintenance of air conditioners (1.5 ton/2 ton) on amc and repairs of refrigerators and water coolers in bhupalpalli area for a period of two years. - reg.
Read moreSupply of new mahindra bolero pik-up 1.5 fitted with bathla vehicle-mounted telescopic ladder, complete with winch, pulley, self-locking mechanism, mounting arrangement, rto registration, road tax and insurance.
Supply of new mahindra bolero pik-up 1.5 fitted with bathla vehicle-mounted telescopic ladder, complete with winch, pulley, self-locking mechanism, mounting arrangement, rto registration, road tax and insurance.
Read moreLaying of cc road from h.no: 20-005 to 22-017 at girinagar under giri nagar ward-283, chintal circle-54 ,qbz,cmc (item no.2) (completion period 1.5 months)
Laying of cc road from h.no: 20-005 to 22-017 at girinagar under giri nagar ward-283, chintal circle-54 ,qbz,cmc (item no.2) (completion period 1.5 months)
Read moreLaying of cc road in road no 4,7 and 8 in balreddy nagar under ganesh nagar ward-284, jeedimetla circle-55,qbz,cmc (reserved for st) (item no.6) (completion period 1.5 month)
Laying of cc road in road no 4,7 and 8 in balreddy nagar under ganesh nagar ward-284, jeedimetla circle-55,qbz,cmc (reserved for st) (item no.6) (completion period 1.5 month)
Read moreLaying of cc road from h.no : 49-411/4/c to 49-403/7/c at bapu nagar under padma nagar-285, jeedimetla circle-55, qpz, cmc (item no.3) (completion period 1.5 month)
Laying of cc road from h.no : 49-411/4/c to 49-403/7/c at bapu nagar under padma nagar-285, jeedimetla circle-55, qpz, cmc (item no.3) (completion period 1.5 month)
Read moreof your Industry type