Tender Details
Particulars | Details |
---|---|
Title |
Bank To Bank Detailed Hydrographic Survey In National Waterway No 2 Schedule C Stretch 3 Pam Dongra Ch. 173.1 Km To Pandu Ch. 259.5 Km
|
Description |
Bank To Bank Detailed Hydrographic Survey In National Waterway No 2 Schedule C Stretch 3 Pam Dongra Ch. 173.1 Km To Pandu Ch. 259.5 Km
|
Organisation | Central Public Procurement Portal 1 |
Tender Id | 2023_IWAI_762672_3 |
Reference Number |
IWAI-15016/4/2022-Hy |
Tender Fee | 5900 |
EMD | 2.79 Lakh |
Tender Value | |
Place | IWAI Noida |
Link | https://eprocure.gov.in |
Start Date | July 21, 2023 15:00 |
End Date |
20/09/2023 ( Expired 610 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of nh353 j stretch from chandur bazarnaka to junctionwith nh 548 c (jasi rani chowk) in paratwada achalpur city to four lane with paved shoulder configuration on epc basis in the state of maharashtra length 6.19 km).
Construction of nh353 j stretch from chandur bazarnaka to junctionwith nh 548 c (jasi rani chowk) in paratwada achalpur city to four lane with paved shoulder configuration on epc basis in the state of maharashtra length 6.19 km).
Read moreReconstruction of 3 nos. of damaged bridges of nh-326 at toyaput nallah at ch. km 261/060, khudipadar nallah at ch. 268/780 km and debagarh river at ch. 270/260 km on nh-326 in the state of odisha. (bid ref no. 11 ce nh of 2024-25)
Reconstruction of 3 nos. of damaged bridges of nh-326 at toyaput nallah at ch. km 261/060, khudipadar nallah at ch. 268/780 km and debagarh river at ch. 270/260 km on nh-326 in the state of odisha. (bid ref no. 11 ce nh of 2024-25)
Read moreUpgradation of existing nh-115 from 2-lane configuration to 2-lane with paved shoulder from km 44.369 to km 54.806 (l 10.437 km) in tinsukia district under dibrugarh nh division in the state of assam under epc mode (job no. 115/as/2024-25/283)
Upgradation of existing nh-115 from 2-lane configuration to 2-lane with paved shoulder from km 44.369 to km 54.806 (l 10.437 km) in tinsukia district under dibrugarh nh division in the state of assam under epc mode (job no. 115/as/2024-25/283)
Read moreSitc and operation and maintenance of advanced traffic management system (atms) on national highway 92, 730b, 730c, and 731k from etawah to pilibhit (length 240.726 km.)in the state of up (gnhcp) with loan assistance of world bank on epc mode
Sitc and operation and maintenance of advanced traffic management system (atms) on national highway 92, 730b, 730c, and 731k from etawah to pilibhit (length 240.726 km.)in the state of up (gnhcp) with loan assistance of world bank on epc mode
Read moreConsultancy services for authority engineer for supervision of 2 lane paved shoulder / 4 laning of damoh jabalpur section of nh-34 in madhya pradesh from damoh (design ch.0.000km) to jabera (design ch.43.500) (pl 43.500 km) under nh(o) on epc mode
Consultancy services for authority engineer for supervision of 2 lane paved shoulder / 4 laning of damoh jabalpur section of nh-34 in madhya pradesh from damoh (design ch.0.000km) to jabera (design ch.43.500) (pl 43.500 km) under nh(o) on epc mode
Read moreConstruction of 2 no. of grade separated interchanges at km 113.730 (ranchi-hazaribagh road) and km 139.225 (ranchi-jamshedpur road) on 4 laning stretch of ranchi bypass of nh-33 in jharkhand on epc mode under nh(o).(total length 6.06 km)-2nd call
Construction of 2 no. of grade separated interchanges at km 113.730 (ranchi-hazaribagh road) and km 139.225 (ranchi-jamshedpur road) on 4 laning stretch of ranchi bypass of nh-33 in jharkhand on epc mode under nh(o).(total length 6.06 km)-2nd call
Read moreConstruction of 2-lane rob at nh lc no. ab-72 on surajpur to ambikapur road in km 357.370 of nh-78 (new nh-43) at railway chainage 1925.11-12 on bishrampur to ambikapur railway line near jainagar in chhattisgarh
Construction of 2-lane rob at nh lc no. ab-72 on surajpur to ambikapur road in km 357.370 of nh-78 (new nh-43) at railway chainage 1925.11-12 on bishrampur to ambikapur railway line near jainagar in chhattisgarh
Read moreMtc of the road from kk road at natingcherra to halambasti via atharomuri under south unakoti v c total length 3 553 km during the year 2025 26 sh patch gsb patch metalling grouting carpeting etc from ch 0 00 km ch 1 78 km
Mtc of the road from kk road at natingcherra to halambasti via atharomuri under south unakoti v c total length 3 553 km during the year 2025 26 sh patch gsb patch metalling grouting carpeting etc from ch 0 00 km ch 1 78 km
Read moreShort term maintenance contract stmc for the stretch from km 35.00 to km 71.60 of nh 275 jalsuru sampaje section pertaining to national highway division mangaluru in the state of karnataka
Short term maintenance contract stmc for the stretch from km 35.00 to km 71.60 of nh 275 jalsuru sampaje section pertaining to national highway division mangaluru in the state of karnataka
Read moreOil bound distempering painting of 100 no houses t1 to t6 exterior paint of 64 no. houses t5 sector 3 and addition of toilet adjoining to house no 2 t8 in existing area of bbmb colony talwara township during the year 2025 26
Oil bound distempering painting of 100 no houses t1 to t6 exterior paint of 64 no. houses t5 sector 3 and addition of toilet adjoining to house no 2 t8 in existing area of bbmb colony talwara township during the year 2025 26
Read moreof your Industry type