Tender Details
Particulars | Details |
---|---|
Title |
Widening And Strengthening Work Of 04 Lane Road From The Main Gate Of Maa Pateshwari Devi Temple To Balrampur Sugar Mill In Tulsipur Vidhan Sabha Of Balrampur District
|
Description |
Widening And Strengthening Work Of 04 Lane Road From The Main Gate Of Maa Pateshwari Devi Temple To Balrampur Sugar Mill In Tulsipur Vidhan Sabha Of Balrampur District
|
Organisation | Chief Engineer Devipatan (Gonda) Zone PWD Gonda | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 11800 |
EMD | 47.25 Lakh |
Tender Value | |
Place | BALRAMPUR |
Link |
AAAAAAAAAA Login to view |
Start Date | April 21, 2025 23:30 |
End Date |
06/05/2025 ( 14 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreServices of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Read moreServices of ie for widening, reconstruction and up-gradation to 2lps for the work of bhimashankar- taleghar-wada-rajgurunagar road (nh-60 spur) in the state of maharashtra ham.
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of bhimashankar- taleghar-wada-rajgurunagar road (nh-60 spur) in the state of maharashtra ham.
Read moreAAAAAAAAAA
Login to viewBalance work of widening improvement to 2 lane lane with paved shoulder from km 27.150 to km 47.682 on dibrugarh to ledo section with proposed margherita and ledo bypass of nh 38 in tinsukia
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreRoad widening and construction work of gaddi adda chouraha to badi puliya marg via v.d. cloth market, nikas chouraha, khajoor wali masjid, k.d. gate and juna somwariya
Road widening and construction work of gaddi adda chouraha to badi puliya marg via v.d. cloth market, nikas chouraha, khajoor wali masjid, k.d. gate and juna somwariya
Read moreWbpwd/pw(r)/se/shc/nit no 02 of 2025-2026(2nd-call)
Herobhanga vidyasagar vidyamandir to jharkhali ferry ghat road, from 0.00 kmp to 3.80 kmp, widening and strengthening work under south 24-parganas highway division, p.w (roads) directorate in the district of south 24-parganas.
Read moreConstruction work of cement concrete road and rcc drain from the house of shri ashok patidar to the house of shri sanjay shukla in vighneshwar nagar in ward no. 28.
Construction work of cement concrete road and rcc drain from the house of shri ashok patidar to the house of shri sanjay shukla in vighneshwar nagar in ward no. 28.
Read moreEstimate balance work under risk and cost for rehabilitation and upgradation of aurangabad jalgaon road nh 753f section iii fardapur jalgaon from km 99 660 to km 144 750 to four lanes with earthen shoulder configuration in the state of maharashtra on
Estimate balance work under risk and cost for rehabilitation and upgradation of aurangabad jalgaon road nh 753f section iii fardapur jalgaon from km 99 660 to km 144 750 to four lanes with earthen shoulder configuration in the state of maharashtra on
Read moreAAAAAAAAAA
Login to viewGhospara road from 2.00 km to 9.00 km and 17.50 km to 21.00 km- strengthening work under barrackpore division, p.w.d. in the district of north 24 parganas. during the year 2024-25..2nd call
Read moreof your Industry type